{"id":29499,"date":"2025-11-28T17:34:45","date_gmt":"2025-11-28T16:34:45","guid":{"rendered":"https:\/\/sisgeo.com\/?p=29499"},"modified":"2025-12-15T14:25:00","modified_gmt":"2025-12-15T13:25:00","slug":"lower-chatkal-hydroelectric-plant","status":"publish","type":"post","link":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/","title":{"rendered":"Lower Chatkal Hydroelectric Plant"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\" id=\"h-new-dam-under-construction-uzbekistan\"><strong>New dam under construction Uzbekistan<\/strong><\/h3>\n\n\n\n<p>The Lower Chatkal Hydroelectric Plant, currently under construction in Uzbekistan, is based on an RCC (Roller Compacted Concrete) dam. Given the scale and strategic importance of the project, the design team required a comprehensive and reliable monitoring system to ensure structural safety and operational efficiency throughout construction and during long-term operation.<\/p>\n\n\n\n<p><strong>Sisgeo was selected to provide technical support to the designers<\/strong>, define the monitoring strategy, and supply the complete set of instruments. This support involved multiple site visits in Uzbekistan and close collaboration with local engineers.<\/p>\n\n\n\n<p>To strengthen knowledge transfer, Sisgeo also hosted a delegation of government officials and technical staff at its headquarters near Milan, Italy. The program included both classroom training sessions on Sisgeo instruments and a technical site visit to the Ravedis RCC dam in Northern Italy, a structure with similar characteristics to the Chatkal dam.<\/p>\n\n\n\n<p>The monitoring system for the Lower Chatkal RCC dam was designed with a comprehensive mix of automatic and manual instrumentation to cover structural, geotechnical, and hydraulic parameters.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-sisgeo-supplied-and-supervised-the-installation-of-the-following-equipment\">Sisgeo supplied and supervised the installation of the following equipment:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/sisgeo.com\/es\/productos\/pendulos\/t-1000-telependulum\/\" target=\"_blank\" rel=\"noreferrer noopener\">Telecoordinometers<\/a> (automatic and manual)<\/li>\n\n\n\n<li><a href=\"https:\/\/sisgeo.com\/es\/productos\/clinometros\/\">T<\/a><a href=\"https:\/\/sisgeo.com\/es\/productos\/clinometros\/\" target=\"_blank\" rel=\"noreferrer noopener\">i<\/a><a href=\"https:\/\/sisgeo.com\/es\/productos\/clinometros\/\">ltmeters<\/a> and 3D crackmeters (manual)<\/li>\n\n\n\n<li><a href=\"https:\/\/sisgeo.com\/es\/productos\/clinometros\/360-tiltmeter-clinometros-digitales-con-tecnologia-mems\/\" target=\"_blank\" rel=\"noreferrer noopener\">Digital 360 tiltmeters<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/sisgeo.com\/es\/productos\/fisurometros-y-medidores-de-juntas\/fisurometros-y-medidores-de-juntas\/\" target=\"_blank\" rel=\"noreferrer noopener\">3D VW crackmeters<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/sisgeo.com\/es\/productos\/temperatura\/termometros-y-cadenas-de-sensores-de-temperatura\/\" target=\"_blank\" rel=\"noreferrer noopener\">Thermometers<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/sisgeo.com\/es\/productos\/extensometros\/mpbx-extensometros-de-varilla\/\" target=\"_blank\" rel=\"noreferrer noopener\">Multipoint borehole extensometers<\/a><\/li>\n\n\n\n<li>Pressure transducers<\/li>\n\n\n\n<li>Water Level Radars<\/li>\n\n\n\n<li>VW pressure gauges<\/li>\n\n\n\n<li><a href=\"https:\/\/sisgeo.com\/es\/productos\/piezometros\/vertederos-y-aforadores\/\" target=\"_blank\" rel=\"noreferrer noopener\">V-notch weirs<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/sisgeo.com\/es\/productos\/dataloggers\/\" target=\"_blank\" rel=\"noreferrer noopener\">Dataloggers and multiplexers for automated data acquisition<\/a><\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>The supply also included instrumentation from Huggenberger, a Sisgeo Group company specialized in monitoring concrete dams.<\/p>\n\n\n\n<p>During the visit to the Ravedis RCC dam, the Uzbek engineers and technicians had the opportunity to observe Sisgeo instruments installed and operating in the field, gaining practical insight into best practices for correct installation and long-term operation.<\/p>\n\n\n\n<p>Thanks to this integrated approach combining: design support, high-quality instrumentation, training, and field experience, the project stakeholders are now fully prepared for the installation and operation of the monitoring system at the Lower Chatkal dam.<\/p>\n\n\n\n<p>Thanks to this integrated approach combining: design support, high-quality instrumentation, training, and field experience, the project stakeholders are now fully prepared for the installation and operation of the monitoring system at the Lower Chatkal dam.<\/p>\n\n\n\n<p>Sisgeo\u2019s solution has ensured:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Enhanced technical capacity of local engineers through hands-on training.<\/li>\n\n\n\n<li>Optimized monitoring strategy, tailored to RCC dam behavior.<\/li>\n\n\n\n<li>Reliable long-term safety assurance through robust and proven instrumentation.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<h5 class=\"wp-block-heading\" id=\"h-the-collaboration-between-sisgeo-huggenberger-and-the-uzbek-authorities-has-created-a-strong-foundation-for-successful-monitoring-of-the-lower-chatkal-hydroelectric-plant-contributing-to-the-dam-s-safe-construction-and-operation\">The collaboration between Sisgeo, <a href=\"https:\/\/www.huggenberger.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Huggenberger,<\/a> and the Uzbek authorities has created a strong foundation for successful monitoring of the Lower Chatkal Hydroelectric Plant, contributing to the dam\u2019s safe construction and operation.<\/h5>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"449\" data-id=\"29741\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1-1024x449.jpg\" alt=\"\" class=\"wp-image-29741\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1-1024x449.jpg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1-300x132.jpg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1-768x337.jpg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg 1140w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"449\" data-id=\"29514\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/1_Chatkal_dam_construction-1024x449.jpg\" alt=\"\" class=\"wp-image-29514\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/1_Chatkal_dam_construction-1024x449.jpg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/1_Chatkal_dam_construction-300x132.jpg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/1_Chatkal_dam_construction-768x337.jpg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/1_Chatkal_dam_construction.jpg 1140w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"449\" data-id=\"29519\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/2_Chatkal_dam_borehole_extensometer-1024x449.jpg\" alt=\"\" class=\"wp-image-29519\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/2_Chatkal_dam_borehole_extensometer-1024x449.jpg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/2_Chatkal_dam_borehole_extensometer-300x132.jpg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/2_Chatkal_dam_borehole_extensometer-768x337.jpg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/2_Chatkal_dam_borehole_extensometer.jpg 1140w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"449\" data-id=\"29524\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/3_Chatkal_dam_borehole_extensometer-1-1024x449.jpg\" alt=\"\" class=\"wp-image-29524\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/3_Chatkal_dam_borehole_extensometer-1-1024x449.jpg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/3_Chatkal_dam_borehole_extensometer-1-300x132.jpg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/3_Chatkal_dam_borehole_extensometer-1-768x337.jpg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/3_Chatkal_dam_borehole_extensometer-1.jpg 1140w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"449\" data-id=\"29529\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/4_Chatkal_dam_meeting-engineers-1024x449.jpg\" alt=\"\" class=\"wp-image-29529\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/4_Chatkal_dam_meeting-engineers-1024x449.jpg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/4_Chatkal_dam_meeting-engineers-300x132.jpg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/4_Chatkal_dam_meeting-engineers-768x337.jpg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/4_Chatkal_dam_meeting-engineers.jpg 1140w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"449\" data-id=\"29534\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/5_Chatkal_dam_huggenberger-product-product-1024x449.jpg\" alt=\"\" class=\"wp-image-29534\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/5_Chatkal_dam_huggenberger-product-product-1024x449.jpg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/5_Chatkal_dam_huggenberger-product-product-300x132.jpg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/5_Chatkal_dam_huggenberger-product-product-768x337.jpg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/5_Chatkal_dam_huggenberger-product-product.jpg 1140w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"449\" data-id=\"29539\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/6_Chatkal_dam_huggenberger-product-product1-1024x449.jpg\" alt=\"\" class=\"wp-image-29539\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/6_Chatkal_dam_huggenberger-product-product1-1024x449.jpg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/6_Chatkal_dam_huggenberger-product-product1-300x132.jpg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/6_Chatkal_dam_huggenberger-product-product1-768x337.jpg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/6_Chatkal_dam_huggenberger-product-product1.jpg 1140w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>New dam under construction Uzbekistan The Lower Chatkal Hydroelectric Plant, currently under construction in Uzbekistan, is based on an RCC (Roller Compacted Concrete) dam. Given the scale and strategic importance of the project, the design team required a comprehensive and reliable monitoring system to ensure structural safety and operational efficiency throughout construction and during long-term [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":29745,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[702,488,467,533,818,817,808,521,699,629,626],"tags":[],"class_list":["post-29499","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-d-clinometro-clinometros-digitales-con-tecnologia-mems","category-datalogger-omnialog","category-fisurometros-y-medidores-de-juntas-es","category-mpbx-extensometros-de-varilla","category-presas-de-hormigon","category-presas-y-energia-hidroelectrica","category-proyectos","category-telependulos","category-termometros-y-cadenas-de-sensores-de-temperatura","category-transducotres-de-nivel-de-agua","category-vertederos-y-aforadores"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lower Chatkal Hydroelectric Plant - Sisgeo<\/title>\n<meta name=\"description\" content=\"The Lower Chatkal Hydroelectric Plant, currently under construction in Uzbekistan, is based on an RCC (Roller Compacted Concrete) dam.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lower Chatkal Hydroelectric Plant\" \/>\n<meta property=\"og:description\" content=\"The Lower Chatkal Hydroelectric Plant, currently under construction in Uzbekistan, is based on an RCC (Roller Compacted Concrete) dam.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"Sisgeo\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-28T16:34:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-15T13:25:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1140\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Martina DeNovellis\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Martina DeNovellis\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/\"},\"author\":{\"name\":\"Martina DeNovellis\",\"@id\":\"https:\/\/sisgeo.com\/es\/#\/schema\/person\/667871730b978d0a4fba5ed570ca6864\"},\"headline\":\"Lower Chatkal Hydroelectric Plant\",\"datePublished\":\"2025-11-28T16:34:45+00:00\",\"dateModified\":\"2025-12-15T13:25:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/\"},\"wordCount\":409,\"publisher\":{\"@id\":\"https:\/\/sisgeo.com\/es\/#organization\"},\"image\":{\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg\",\"articleSection\":[\"D-CLIN\u00d3METRO \u2013 clin\u00f3metros digitales con tecnolog\u00eda MEMS\",\"Datalogger OMNIAlog\",\"Fisur\u00f3metros y medidores de juntas\",\"MPBX - Extens\u00f3metros de varilla\",\"PRESAS DE HORMIG\u00d3N\",\"Presas y energ\u00eda hidroel\u00e9ctrica\",\"Proyectos\",\"Telep\u00e9ndulos\",\"Term\u00f3metros y cadenas de sensores de temperatura\",\"Transducotres de nivel de agua\",\"Vertederos y aforadores\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/\",\"url\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/\",\"name\":\"Lower Chatkal Hydroelectric Plant - Sisgeo\",\"isPartOf\":{\"@id\":\"https:\/\/sisgeo.com\/es\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg\",\"datePublished\":\"2025-11-28T16:34:45+00:00\",\"dateModified\":\"2025-12-15T13:25:00+00:00\",\"description\":\"The Lower Chatkal Hydroelectric Plant, currently under construction in Uzbekistan, is based on an RCC (Roller Compacted Concrete) dam.\",\"breadcrumb\":{\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#primaryimage\",\"url\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg\",\"contentUrl\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg\",\"width\":1140,\"height\":500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/sisgeo.com\/es\/geotechnical-and-structural-instrumentation-for-shm\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Proyectos\",\"item\":\"https:\/\/sisgeo.com\/es\/category\/proyectos\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Lower Chatkal Hydroelectric Plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/sisgeo.com\/es\/#website\",\"url\":\"https:\/\/sisgeo.com\/es\/\",\"name\":\"Sisgeo\",\"description\":\"Inclined to improvement\",\"publisher\":{\"@id\":\"https:\/\/sisgeo.com\/es\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/sisgeo.com\/es\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/sisgeo.com\/es\/#organization\",\"name\":\"Sisgeo S.r.l.\",\"url\":\"https:\/\/sisgeo.com\/es\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/sisgeo.com\/es\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png\",\"contentUrl\":\"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png\",\"width\":205,\"height\":97,\"caption\":\"Sisgeo S.r.l.\"},\"image\":{\"@id\":\"https:\/\/sisgeo.com\/es\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/sisgeo.com\/es\/#\/schema\/person\/667871730b978d0a4fba5ed570ca6864\",\"name\":\"Martina DeNovellis\",\"url\":\"https:\/\/sisgeo.com\/es\/author\/martina-denovellis\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lower Chatkal Hydroelectric Plant - Sisgeo","description":"The Lower Chatkal Hydroelectric Plant, currently under construction in Uzbekistan, is based on an RCC (Roller Compacted Concrete) dam.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/","og_locale":"es_ES","og_type":"article","og_title":"Lower Chatkal Hydroelectric Plant","og_description":"The Lower Chatkal Hydroelectric Plant, currently under construction in Uzbekistan, is based on an RCC (Roller Compacted Concrete) dam.","og_url":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/","og_site_name":"Sisgeo","article_published_time":"2025-11-28T16:34:45+00:00","article_modified_time":"2025-12-15T13:25:00+00:00","og_image":[{"width":1140,"height":500,"url":"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg","type":"image\/jpeg"}],"author":"Martina DeNovellis","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Martina DeNovellis","Tiempo de lectura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#article","isPartOf":{"@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/"},"author":{"name":"Martina DeNovellis","@id":"https:\/\/sisgeo.com\/es\/#\/schema\/person\/667871730b978d0a4fba5ed570ca6864"},"headline":"Lower Chatkal Hydroelectric Plant","datePublished":"2025-11-28T16:34:45+00:00","dateModified":"2025-12-15T13:25:00+00:00","mainEntityOfPage":{"@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/"},"wordCount":409,"publisher":{"@id":"https:\/\/sisgeo.com\/es\/#organization"},"image":{"@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg","articleSection":["D-CLIN\u00d3METRO \u2013 clin\u00f3metros digitales con tecnolog\u00eda MEMS","Datalogger OMNIAlog","Fisur\u00f3metros y medidores de juntas","MPBX - Extens\u00f3metros de varilla","PRESAS DE HORMIG\u00d3N","Presas y energ\u00eda hidroel\u00e9ctrica","Proyectos","Telep\u00e9ndulos","Term\u00f3metros y cadenas de sensores de temperatura","Transducotres de nivel de agua","Vertederos y aforadores"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/","url":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/","name":"Lower Chatkal Hydroelectric Plant - Sisgeo","isPartOf":{"@id":"https:\/\/sisgeo.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#primaryimage"},"image":{"@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg","datePublished":"2025-11-28T16:34:45+00:00","dateModified":"2025-12-15T13:25:00+00:00","description":"The Lower Chatkal Hydroelectric Plant, currently under construction in Uzbekistan, is based on an RCC (Roller Compacted Concrete) dam.","breadcrumb":{"@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#primaryimage","url":"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg","contentUrl":"https:\/\/sisgeo.com\/wp-content\/uploads\/2025\/11\/0_Chatkal_dam_panoramic_view-1.jpg","width":1140,"height":500},{"@type":"BreadcrumbList","@id":"https:\/\/sisgeo.com\/es\/proyectos\/lower-chatkal-hydroelectric-plant\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/sisgeo.com\/es\/geotechnical-and-structural-instrumentation-for-shm\/"},{"@type":"ListItem","position":2,"name":"Proyectos","item":"https:\/\/sisgeo.com\/es\/category\/proyectos\/"},{"@type":"ListItem","position":3,"name":"Lower Chatkal Hydroelectric Plant"}]},{"@type":"WebSite","@id":"https:\/\/sisgeo.com\/es\/#website","url":"https:\/\/sisgeo.com\/es\/","name":"Sisgeo","description":"Inclined to improvement","publisher":{"@id":"https:\/\/sisgeo.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/sisgeo.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/sisgeo.com\/es\/#organization","name":"Sisgeo S.r.l.","url":"https:\/\/sisgeo.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/sisgeo.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png","contentUrl":"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png","width":205,"height":97,"caption":"Sisgeo S.r.l."},"image":{"@id":"https:\/\/sisgeo.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/sisgeo.com\/es\/#\/schema\/person\/667871730b978d0a4fba5ed570ca6864","name":"Martina DeNovellis","url":"https:\/\/sisgeo.com\/es\/author\/martina-denovellis\/"}]}},"_links":{"self":[{"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/posts\/29499","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/comments?post=29499"}],"version-history":[{"count":11,"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/posts\/29499\/revisions"}],"predecessor-version":[{"id":29748,"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/posts\/29499\/revisions\/29748"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/media\/29745"}],"wp:attachment":[{"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/media?parent=29499"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/categories?post=29499"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sisgeo.com\/es\/wp-json\/wp\/v2\/tags?post=29499"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}