{"id":22459,"date":"2023-09-19T12:32:45","date_gmt":"2023-09-19T10:32:45","guid":{"rendered":"https:\/\/sisgeo.com\/non-classifiee\/highway-4g-cucuta-pamplona\/"},"modified":"2023-09-19T12:32:45","modified_gmt":"2023-09-19T10:32:45","slug":"highway-4g-cucuta-pamplona","status":"publish","type":"post","link":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/","title":{"rendered":"Highway 4G C\u00facuta &#8211; Pamplona"},"content":{"rendered":"<p>The Uni\u00f3n Vial R\u00edo Pamplonita Concessionaire is in charge of the Pamplona-C\u00facuta dual carriageway, the most important road infrastructure work in Norte de Santander. This project is a solution to the border mobility between Colombia and Venezuela, as well as with the northeast of Colombia. The main characteristics of the project are:<\/p>\n<ul>\n<li>its length of 62.2 km;<\/li>\n<li>50.2 km of new road construction (double carriageway and single carriageway);<\/li>\n<li>rehabilitation of 72.2 km existing road (Pamplona-Betania sector, Los Patios);<\/li>\n<li>two tunnels of 1.4 km and 1.1 km length;<\/li>\n<li>several bridges so divided: 25 vehicular, 4 pedestrian and rehabilitation of 23 existing bridges.<\/li>\n<\/ul>\n<p>On the potentially unstable slopes of the new highway, Sisgeo Latinoam\u00e9rica supplied and installed more than 150 DEX-S digital probes. Every chain of DEX-S is connected with digital radio datalogger and all the signals will be collected, in the future, by Gateways. These special 3D gauges will permit to keep under control the vertical and horizontal movements of the slopes during the operation. In the tunnels have been installed structural pressure cells and 3-point Extensometers. All the signals actually are collected in our switch terminal boxes ready for manual readings.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Uni\u00f3n Vial R\u00edo Pamplonita Concessionaire is in charge of the Pamplona-C\u00facuta dual carriageway, the most important road infrastructure work in Norte de Santander. This project is a solution to the border mobility between Colombia and Venezuela, as well as with the northeast of Colombia. The main characteristics of the project are: its length of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6029,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[555,664,640,513,489,777,770,767,531,633,754,538,778,776],"tags":[],"class_list":["post-22459","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-dex-et-dex-s-3d-extenso-inclinometres","category-cellules-de-pression-hydraulique","category-crd-400-poste-de-lecture-polyvalent","category-enregistreur-new-leonardo","category-enregistreurs-de-donnees-sans-fil-wr-log","category-fouilles-profondes","category-glissement-de-terrain-rotationnel","category-glissements-de-terrain","category-mpbx-extensometres-en-forage-multipoints","category-piezometre-a-corde-vibrante","category-projets","category-tube-inclinometrique-a-raccord-lisse-easy-lock","category-tunnel-natm-fr","category-tunnels-et-excavations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Highway 4G C\u00facuta - Pamplona - Sisgeo<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Highway 4G C\u00facuta - Pamplona\" \/>\n<meta property=\"og:description\" content=\"The Uni\u00f3n Vial R\u00edo Pamplonita Concessionaire is in charge of the Pamplona-C\u00facuta dual carriageway, the most important road infrastructure work in Norte de Santander. This project is a solution to the border mobility between Colombia and Venezuela, as well as with the northeast of Colombia. The main characteristics of the project are: its length of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/\" \/>\n<meta property=\"og:site_name\" content=\"Sisgeo\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-19T10:32:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"540\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Staff Pipeline\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Staff Pipeline\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/\"},\"author\":{\"name\":\"Staff Pipeline\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#\/schema\/person\/ad7e82c7990ef88823f081613e1100e2\"},\"headline\":\"Highway 4G C\u00facuta &#8211; Pamplona\",\"datePublished\":\"2023-09-19T10:32:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/\"},\"wordCount\":192,\"publisher\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg\",\"articleSection\":[\"3D Extenso-inclinom\u00e8tre DEX-S\",\"Cellules de pression hydraulique\",\"CRD-400 Poste de lecture polyvalent\",\"Enregistreur new Leonardo\",\"Enregistreurs de donn\u00e9es sans fil WR LOG\",\"FOUILLES PROFONDES\",\"Glissement de terrain rotationnel\",\"Glissements de terrain et risques naturels\",\"MPBX - Extensom\u00e8tres en Forage multipoints\",\"Pi\u00e9zom\u00e8tre \u00e0 corde vibrante\",\"Projets\",\"Tube inclinom\u00e9trique \u00e0 raccord lisse \\\"Easy Lock\\\"\",\"Tunnel NATM\",\"Tunnels et fouilles profondes\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/\",\"url\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/\",\"name\":\"Highway 4G C\u00facuta - Pamplona - Sisgeo\",\"isPartOf\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg\",\"datePublished\":\"2023-09-19T10:32:45+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#primaryimage\",\"url\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg\",\"contentUrl\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg\",\"width\":960,\"height\":540},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/sisgeo.com\/fr\/linstrumentation-geotechnique-et-structurale-pour-le-shm\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projets\",\"item\":\"https:\/\/sisgeo.com\/fr\/category\/projets\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Highway 4G C\u00facuta &#8211; Pamplona\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#website\",\"url\":\"https:\/\/sisgeo.com\/fr\/\",\"name\":\"Sisgeo\",\"description\":\"Inclined to improvement\",\"publisher\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/sisgeo.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#organization\",\"name\":\"Sisgeo S.r.l.\",\"url\":\"https:\/\/sisgeo.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png\",\"contentUrl\":\"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png\",\"width\":205,\"height\":97,\"caption\":\"Sisgeo S.r.l.\"},\"image\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#\/schema\/person\/ad7e82c7990ef88823f081613e1100e2\",\"name\":\"Staff Pipeline\",\"sameAs\":[\"https:\/\/www.pipeline.it\/\"],\"url\":\"https:\/\/sisgeo.com\/fr\/author\/staff-pipeline\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Highway 4G C\u00facuta - Pamplona - Sisgeo","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/","og_locale":"fr_FR","og_type":"article","og_title":"Highway 4G C\u00facuta - Pamplona","og_description":"The Uni\u00f3n Vial R\u00edo Pamplonita Concessionaire is in charge of the Pamplona-C\u00facuta dual carriageway, the most important road infrastructure work in Norte de Santander. This project is a solution to the border mobility between Colombia and Venezuela, as well as with the northeast of Colombia. The main characteristics of the project are: its length of [&hellip;]","og_url":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/","og_site_name":"Sisgeo","article_published_time":"2023-09-19T10:32:45+00:00","og_image":[{"width":960,"height":540,"url":"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg","type":"image\/jpeg"}],"author":"Staff Pipeline","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Staff Pipeline","Dur\u00e9e de lecture estim\u00e9e":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#article","isPartOf":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/"},"author":{"name":"Staff Pipeline","@id":"https:\/\/sisgeo.com\/fr\/#\/schema\/person\/ad7e82c7990ef88823f081613e1100e2"},"headline":"Highway 4G C\u00facuta &#8211; Pamplona","datePublished":"2023-09-19T10:32:45+00:00","mainEntityOfPage":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/"},"wordCount":192,"publisher":{"@id":"https:\/\/sisgeo.com\/fr\/#organization"},"image":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#primaryimage"},"thumbnailUrl":"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg","articleSection":["3D Extenso-inclinom\u00e8tre DEX-S","Cellules de pression hydraulique","CRD-400 Poste de lecture polyvalent","Enregistreur new Leonardo","Enregistreurs de donn\u00e9es sans fil WR LOG","FOUILLES PROFONDES","Glissement de terrain rotationnel","Glissements de terrain et risques naturels","MPBX - Extensom\u00e8tres en Forage multipoints","Pi\u00e9zom\u00e8tre \u00e0 corde vibrante","Projets","Tube inclinom\u00e9trique \u00e0 raccord lisse \"Easy Lock\"","Tunnel NATM","Tunnels et fouilles profondes"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/","url":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/","name":"Highway 4G C\u00facuta - Pamplona - Sisgeo","isPartOf":{"@id":"https:\/\/sisgeo.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#primaryimage"},"image":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#primaryimage"},"thumbnailUrl":"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg","datePublished":"2023-09-19T10:32:45+00:00","breadcrumb":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#primaryimage","url":"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg","contentUrl":"https:\/\/sisgeo.com\/wp-content\/uploads\/2023\/08\/Highway_4G_Cucuta_-_Pamplona_0_723cf.jpg","width":960,"height":540},{"@type":"BreadcrumbList","@id":"https:\/\/sisgeo.com\/fr\/projets\/highway-4g-cucuta-pamplona\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/sisgeo.com\/fr\/linstrumentation-geotechnique-et-structurale-pour-le-shm\/"},{"@type":"ListItem","position":2,"name":"Projets","item":"https:\/\/sisgeo.com\/fr\/category\/projets\/"},{"@type":"ListItem","position":3,"name":"Highway 4G C\u00facuta &#8211; Pamplona"}]},{"@type":"WebSite","@id":"https:\/\/sisgeo.com\/fr\/#website","url":"https:\/\/sisgeo.com\/fr\/","name":"Sisgeo","description":"Inclined to improvement","publisher":{"@id":"https:\/\/sisgeo.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/sisgeo.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/sisgeo.com\/fr\/#organization","name":"Sisgeo S.r.l.","url":"https:\/\/sisgeo.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/sisgeo.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png","contentUrl":"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png","width":205,"height":97,"caption":"Sisgeo S.r.l."},"image":{"@id":"https:\/\/sisgeo.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/sisgeo.com\/fr\/#\/schema\/person\/ad7e82c7990ef88823f081613e1100e2","name":"Staff Pipeline","sameAs":["https:\/\/www.pipeline.it\/"],"url":"https:\/\/sisgeo.com\/fr\/author\/staff-pipeline\/"}]}},"_links":{"self":[{"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/posts\/22459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/comments?post=22459"}],"version-history":[{"count":0,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/posts\/22459\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/media\/6029"}],"wp:attachment":[{"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/media?parent=22459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/categories?post=22459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/tags?post=22459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}