{"id":26941,"date":"2024-11-12T11:46:26","date_gmt":"2024-11-12T10:46:26","guid":{"rendered":"https:\/\/sisgeo.com\/non-classifiee\/andijan-dam-rehabilitation-project\/"},"modified":"2024-11-12T11:46:26","modified_gmt":"2024-11-12T10:46:26","slug":"andijan-dam-rehabilitation-project","status":"publish","type":"post","link":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/","title":{"rendered":"Andijan Dam Rehabilitation Project"},"content":{"rendered":"\n<p>The Andijan Dam, located on the Karadarya River in the Andijan region of Uzbekistan, is a significant hydroelectric facility. Constructed between 1964 and 1974, the dam plays a crucial role in both irrigation and power generation. The dam stands at 115 meters high and stretches 1,900 meters in length, creating the Andijan Reservoir with a capacity of about 1.9 billion cubic meters of water.<\/p>\n\n\n\n<p>The hydroelectric power station associated with the dam generates approximately 150 MW of electricity, contributing to the local grid and supporting the region&rsquo;s energy needs. Beyond power production, the dam is vital for agricultural irrigation, supplying water to vast areas of farmland in the Fergana Valley, one of Uzbekistan&rsquo;s most fertile regions.<\/p>\n\n\n\n<p>The first step was an inspection by Sisgeo&rsquo;s technicians, after which they were able to assist the designer in defining the most innovative solutions for the rehabilitation of the monitoring system. Then they payed several visits to ensure the correct installation of the instrumentation, cabling, and configuration of the dataloggers, which integrated both wired and wireless automatic dataloggers.<\/p>\n\n\n\n<p>Main equipment provided:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Self-compensated Pressure transducers<\/li>\n\n\n\n<li>Thermometers<\/li>\n\n\n\n<li>Digital Biaxial Tiltmeters<\/li>\n\n\n\n<li>Manometers<\/li>\n\n\n\n<li>Telecoordinometers<\/li>\n\n\n\n<li>VW Crackmeters<\/li>\n\n\n\n<li>Portable readouts<\/li>\n\n\n\n<li>Automatic wired dataloggers<\/li>\n\n\n\n<li>Automatic wireless dataloggers<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>The results achieved and the benefits for the customer include fully automated measurements with high accuracy and a significant reduction in costs.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"450\" data-id=\"26916\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg\" alt=\"\" class=\"wp-image-26916\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3-300x132.jpg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3-768x338.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"883\" data-id=\"26930\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.34-3-1024x883.jpeg\" alt=\"\" class=\"wp-image-26930\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.34-3-1024x883.jpeg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.34-3-300x259.jpeg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.34-3-768x663.jpeg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.34-3.jpeg 1478w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"534\" data-id=\"26888\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-03-at-17.06.23-11-1-1-1024x534.jpg\" alt=\"\" class=\"wp-image-26888\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-03-at-17.06.23-11-1-1-1024x534.jpg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-03-at-17.06.23-11-1-1-300x157.jpg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-03-at-17.06.23-11-1-1-768x401.jpg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-03-at-17.06.23-11-1-1.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"478\" data-id=\"26903\" src=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.26-1-1024x478.jpeg\" alt=\"\" class=\"wp-image-26903\" srcset=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.26-1-1024x478.jpeg 1024w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.26-1-300x140.jpeg 300w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.26-1-768x359.jpeg 768w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.26-1-1536x717.jpeg 1536w, https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-07-10-at-13.09.26-1.jpeg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Andijan Dam, located on the Karadarya River in the Andijan region of Uzbekistan, is a significant hydroelectric facility. Constructed between 1964 and 1974, the dam plays a crucial role in both irrigation and power generation. The dam stands at 115 meters high and stretches 1,900 meters in length, creating the Andijan Reservoir with a [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":26917,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[763,522,486,489,651,754,765],"tags":[],"class_list":["post-26941","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-barrages-et-hydroelectricite","category-deformetres-betonnables-a-corde-vibrante","category-enregistreur-de-donnees-omnialog","category-enregistreurs-de-donnees-sans-fil-wr-log","category-poste-de-lecture-mind","category-projets","category-rehabilitation-des-barrages"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Andijan Dam Rehabilitation Project - Sisgeo<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Andijan Dam Rehabilitation Project\" \/>\n<meta property=\"og:description\" content=\"The Andijan Dam, located on the Karadarya River in the Andijan region of Uzbekistan, is a significant hydroelectric facility. Constructed between 1964 and 1974, the dam plays a crucial role in both irrigation and power generation. The dam stands at 115 meters high and stretches 1,900 meters in length, creating the Andijan Reservoir with a [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Sisgeo\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-12T10:46:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"450\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Marchini Florinda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marchini Florinda\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/\"},\"author\":{\"name\":\"Marchini Florinda\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#\/schema\/person\/c3a7f953591992c80846a01e3e81a6f4\"},\"headline\":\"Andijan Dam Rehabilitation Project\",\"datePublished\":\"2024-11-12T10:46:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/\"},\"wordCount\":220,\"publisher\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg\",\"articleSection\":[\"Barrages et hydro\u00e9lectricit\u00e9\",\"D\u00e9form\u00e8tres b\u00e9tonnables \u00e0 corde vibrante\",\"Enregistreur de donn\u00e9es OMNIAlog\",\"Enregistreurs de donn\u00e9es sans fil WR LOG\",\"Poste de lecture MIND\",\"Projets\",\"R\u00c9HABILITATION DES BARRAGES\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/\",\"url\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/\",\"name\":\"Andijan Dam Rehabilitation Project - Sisgeo\",\"isPartOf\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg\",\"datePublished\":\"2024-11-12T10:46:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#primaryimage\",\"url\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg\",\"contentUrl\":\"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg\",\"width\":1024,\"height\":450,\"caption\":\"SHM in dam rehabilitation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/sisgeo.com\/fr\/linstrumentation-geotechnique-et-structurale-pour-le-shm\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Non classifi\u00e9(e)\",\"item\":\"https:\/\/sisgeo.com\/fr\/category\/non-classifiee\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Andijan Dam Rehabilitation Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#website\",\"url\":\"https:\/\/sisgeo.com\/fr\/\",\"name\":\"Sisgeo\",\"description\":\"Inclined to improvement\",\"publisher\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/sisgeo.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#organization\",\"name\":\"Sisgeo S.r.l.\",\"url\":\"https:\/\/sisgeo.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png\",\"contentUrl\":\"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png\",\"width\":205,\"height\":97,\"caption\":\"Sisgeo S.r.l.\"},\"image\":{\"@id\":\"https:\/\/sisgeo.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/sisgeo.com\/fr\/#\/schema\/person\/c3a7f953591992c80846a01e3e81a6f4\",\"name\":\"Marchini Florinda\",\"url\":\"https:\/\/sisgeo.com\/fr\/author\/marchini-florinda\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Andijan Dam Rehabilitation Project - Sisgeo","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/","og_locale":"fr_FR","og_type":"article","og_title":"Andijan Dam Rehabilitation Project","og_description":"The Andijan Dam, located on the Karadarya River in the Andijan region of Uzbekistan, is a significant hydroelectric facility. Constructed between 1964 and 1974, the dam plays a crucial role in both irrigation and power generation. The dam stands at 115 meters high and stretches 1,900 meters in length, creating the Andijan Reservoir with a [&hellip;]","og_url":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/","og_site_name":"Sisgeo","article_published_time":"2024-11-12T10:46:26+00:00","og_image":[{"width":1024,"height":450,"url":"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg","type":"image\/jpeg"}],"author":"Marchini Florinda","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Marchini Florinda","Dur\u00e9e de lecture estim\u00e9e":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#article","isPartOf":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/"},"author":{"name":"Marchini Florinda","@id":"https:\/\/sisgeo.com\/fr\/#\/schema\/person\/c3a7f953591992c80846a01e3e81a6f4"},"headline":"Andijan Dam Rehabilitation Project","datePublished":"2024-11-12T10:46:26+00:00","mainEntityOfPage":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/"},"wordCount":220,"publisher":{"@id":"https:\/\/sisgeo.com\/fr\/#organization"},"image":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#primaryimage"},"thumbnailUrl":"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg","articleSection":["Barrages et hydro\u00e9lectricit\u00e9","D\u00e9form\u00e8tres b\u00e9tonnables \u00e0 corde vibrante","Enregistreur de donn\u00e9es OMNIAlog","Enregistreurs de donn\u00e9es sans fil WR LOG","Poste de lecture MIND","Projets","R\u00c9HABILITATION DES BARRAGES"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/","url":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/","name":"Andijan Dam Rehabilitation Project - Sisgeo","isPartOf":{"@id":"https:\/\/sisgeo.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#primaryimage"},"image":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#primaryimage"},"thumbnailUrl":"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg","datePublished":"2024-11-12T10:46:26+00:00","breadcrumb":{"@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#primaryimage","url":"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg","contentUrl":"https:\/\/sisgeo.com\/wp-content\/uploads\/2024\/11\/photos-by-Danil-Usmanov-via-eurasianet-3.jpg","width":1024,"height":450,"caption":"SHM in dam rehabilitation"},{"@type":"BreadcrumbList","@id":"https:\/\/sisgeo.com\/fr\/projets\/andijan-dam-rehabilitation-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/sisgeo.com\/fr\/linstrumentation-geotechnique-et-structurale-pour-le-shm\/"},{"@type":"ListItem","position":2,"name":"Non classifi\u00e9(e)","item":"https:\/\/sisgeo.com\/fr\/category\/non-classifiee\/"},{"@type":"ListItem","position":3,"name":"Andijan Dam Rehabilitation Project"}]},{"@type":"WebSite","@id":"https:\/\/sisgeo.com\/fr\/#website","url":"https:\/\/sisgeo.com\/fr\/","name":"Sisgeo","description":"Inclined to improvement","publisher":{"@id":"https:\/\/sisgeo.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/sisgeo.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/sisgeo.com\/fr\/#organization","name":"Sisgeo S.r.l.","url":"https:\/\/sisgeo.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/sisgeo.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png","contentUrl":"https:\/\/sisgeodev.pipehosting.it\/wp-content\/uploads\/2023\/06\/logo-RGB.png","width":205,"height":97,"caption":"Sisgeo S.r.l."},"image":{"@id":"https:\/\/sisgeo.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/sisgeo.com\/fr\/#\/schema\/person\/c3a7f953591992c80846a01e3e81a6f4","name":"Marchini Florinda","url":"https:\/\/sisgeo.com\/fr\/author\/marchini-florinda\/"}]}},"_links":{"self":[{"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/posts\/26941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/comments?post=26941"}],"version-history":[{"count":0,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/posts\/26941\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/media\/26917"}],"wp:attachment":[{"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/media?parent=26941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/categories?post=26941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sisgeo.com\/fr\/wp-json\/wp\/v2\/tags?post=26941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}