Betania Dam Rehabilitation Project
Betania Dam Rehabilitation Project

Cliente

Paese

Luogo

Inizio

Betania HPP, situated in Huila, Colombia, boasts an installed capacity of 540.9 MW. Sisgeo Latinamèrica spearheaded the service and installation of the seismic monitoring system. Moreover, we undertook the following initiatives:

  • Rehabilitation of 8 inclinometers;
  • Execution of general civil works and construction of a new facility;
  • Replacement and installation of 3 new wireless accelerometers, along with setting up associated servers and dynamic system management software. These endeavors signify our commitment to enhancing infrastructure efficiency and safety in Colombia’s energy landscape.

Products involved:

  • Dynamic systems wireless Sara Srl.

Prodotti
Correlati

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English