Growing know-how, inclined to innovation – SISGEO’s 30 years anniversary

Komayestan Dam, I.R. of Iran

Project Name: Komayestan Dam Purpose of the project: Irrigation Project location: IRAN – Khorasan- Sabzevar Client: Khorasan Regional Water Authority Contractor: Kahar –e- Khorasan CO. Dam Type: Concrete gravity dam Height above foundation: 34.5 m Crest length: 835 m Capacity of the Reservoir: 1,200,000 m3 End of construction: February 2002

SISGEO’s 30 years anniversary – Kilometro Rosso Innovation District

This video is a recollection of the first incredible day of the event for Sisgeo’s 30 years anniversary, once again we’d like to thank the speakers who shared their knowledge and experience with all of us. Their presentations offered us interesting insights and new perspectives on monitoring. Hope you love it! Here’s the list of […]

Golestan II Dam , I.R. of Iran

Project Name: Golestan II Dam Purpose of the project: Irrigation Project location: IRAN-GOLESTAN Client: Mazandaran & Golestan Regional Water Authority Contractor: PORNAM CO. Dam Type: HEMOGEN EARTH DAM Height above foundation: 32 (m) Crest level (above sea level): 102 Crest length: 622 (m) Capacity of the Reservoir: 36000000 m3 End of construction: 2005

Tangab Dam, I.R. of Iran

Project Name: Tangab Dam Purpose of the project: Irrigotion & Resort Area Project location: IRAN – Shiraz Client: FARS Regional Water Authority Contractor:EV- YOL CO. Dam Type: Rock Fill With Chimney Clay Core Height above foundation: 51 m Crest length: 270 m Capacity of the Reservoir: 130,000,000 m3 End of construction: Under Construction Will Be […]

Bidvaz Esfarayen Dam, Islamic Republic of IRAN

Project Name: Bidvaz Esfarayen Dam Purpose of the project: Agricolture & Irrigation Project location: Khorasan- Esfarayen Client: Khorasan Regional Water Authority Contractor: Gostaresh Nosazi Sanayee Iran CO. Dam Type: Earth Fill Dam With Clay Core Height above foundation: 60 (m) Crest level (above sea level): 1534 Crest length: 113 (m) End of construction: June 2005

Mollasadra Dam – Iran

GENERAL INFORMATION Project Name: Mollasadra DamPurpose of the project: Agricultural & Energy productionProject location: IRAN – FARSClient: FARS Regional Water AuthorityContractor: Melli Sakhteman. CoDam Type: Earth Fill Dam With Clay CoreHeight above foundation: 72 mCrest level (above sea level): 2122 (m)Crest length: 630 mCapacity of the Reservoir: 440,000,000 m3End of construction January: 2006 INSTRUMENTS INSTALLED […]

Karahnjukar Hydroelectric Project, Iceland

The Kárahnjúkar dam is a concrete-faced rock fill dam (CFRD) type with a maximum height of 193m and, when completed it will be the highest of its kind in Europe and among the highest in the world. When full the level of the 57km2 the Hálslón storage reservoir will reach the height of 625m above […]

Mazar hydroelectric project, Ecuador

The Mazar hydroelectric power plant site is located in the south-eastern part of Ecuador and consists of the 2nd phase of the exploitation of the potential energy of the middle course of the Río Paute. The Mazar hydroelectric power project will be constructed immediately upstream of the Amaluza reservoir and will have a capacity of […]

ICGSM – 9th International Course on Geotechnical and Structural Monitoring

Sisgeo will participate to the 9TH INTERNATIONAL COURSE ON GEOTECHNICAL AND STRUCTURAL MONITORING (ICGSM) in Rome, Italy’s capital, on 02-06/05/2023. We’re proud to say that this year we’ll be present as a gold sponsor of the event and that Vincenzo Caci, Sisgeo’s General Manager, will be one of the speakers in the roundtable on the […]

Informatizzazione del reparto produttivo ed acquistato nuove attrezzature

AL VIA – Agevolazioni Lombarde per la Valorizzazione degli Investimenti Aziendali SISGEO SRL – INFORMATIZZAZIONE DEL REPARTO PRODUTTIVO ED ACQUISTO AUTOCLAVE E PRESSA PER CALIBRAZIONE CELLE DI CARICO Iniziativa realizzata nell’ambito dell’Asse Prioritario III: Promuovere la competitività delle piccole e medie imprese / Obiettivo Investimenti in favore della crescita e dell’occupazioneObiettivo: Investimenti in favore della […]

TELT – Tunnel Euralpin Lyon Turin, Surveillance du noveau tunnel ferroviaire à grande vitesse

Le tunnel Euralpin Lyon-Turin est l’un des plus importants projets souterrains en construction en Europe. Ce projet concerne la réalisation d’un double tunnel ferroviaire entre Susa/Bussoleno (Italie) et Saint-Jean-de-Maurienne (France), pour une longueur totale de 57 km. Sisgeo fournit, installe et traite les données des instruments dans la descenderie de Saint Martin La Porte, dans […]