Autopista al Mar 2 project
Autopista al Mar 2 project

Cliente

Paese

Luogo

Inizio

Fine

The Autopista al Mar 2 project is composed by six functional units, covering a total length of 254 kilometers between the municipalities of Cañasgordas and Necoclí, in Antioquia.

The works include the construction of 17.7 kilometres of single carriageway, 63 bridges and 14 tunnels, including the Fuemia tunnel and two false tunnels.

SISGEO LATINOAMÉRICA provides its services to CHEC for the supply and installation of 500 KN load cells in portals 2, 4 and 8 of the tunnels that serve the Autopista Mar 2, part of the Autopistas de Urabá Concession. Dabeiba – Antioquia.

In addition, inclinometer casings and a Brain system have been supplied to control horizontal movements on cutting slopes and portals.

Prodotti
Correlati

Sisgeo Piezometers: Comprehensive Solutions for Groundwater Monitoring

What You’ll Learn:

  • Detailed overview of Sisgeo’s range of piezometer technologies including vibrating wire and electric piezometers, outlining their operating principles, installation methods, and suitability for diverse site conditions.
  • Selection of piezometer filters, emphasizing materials and designs that conform to ISO 18674-4 standards.
  • Integration of piezometer data with automated acquisition systems.
  • Best practices for calibration and maintenance standards.

When:Thu, Jul 31, 2025 3:00 PM – 4:00 PM CEST
Language: English

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English