Koohrang HPP , I. R. of IRAN
Project Name: Koohrang HPP Purpose of the projectGenerate: 128,000,000 Gwh/ y Electrical Energy Project location: IRAN-Shahre kord Client: I.W.P.C Contractor: Payab kosar – Canivo Dam Type: Earth Fill Dam Height above foundation: 15 m Crest level (above sea level): 2345.5 Crest length: 470 m Capacity of the Reservoir: 100,000 m<<3<< Foundation soil: SG-GC End of […]
Tangab Dam, I.R. of Iran
Project Name: Tangab Dam Purpose of the project: Irrigotion & Resort Area Project location: IRAN – Shiraz Client: FARS Regional Water Authority Contractor:EV- YOL CO. Dam Type: Rock Fill With Chimney Clay Core Height above foundation: 51 m Crest length: 270 m Capacity of the Reservoir: 130,000,000 m3 End of construction: Under Construction Will Be […]
Bidvaz Esfarayen Dam, Islamic Republic of IRAN
Project Name: Bidvaz Esfarayen Dam Purpose of the project: Agricolture & Irrigation Project location: Khorasan- Esfarayen Client: Khorasan Regional Water Authority Contractor: Gostaresh Nosazi Sanayee Iran CO. Dam Type: Earth Fill Dam With Clay Core Height above foundation: 60 (m) Crest level (above sea level): 1534 Crest length: 113 (m) End of construction: June 2005
Mollasadra Dam – Iran
GENERAL INFORMATION Project Name: Mollasadra DamPurpose of the project: Agricultural & Energy productionProject location: IRAN – FARSClient: FARS Regional Water AuthorityContractor: Melli Sakhteman. CoDam Type: Earth Fill Dam With Clay CoreHeight above foundation: 72 mCrest level (above sea level): 2122 (m)Crest length: 630 mCapacity of the Reservoir: 440,000,000 m3End of construction January: 2006 INSTRUMENTS INSTALLED […]
Karahnjukar Hydroelectric Project, Iceland
The Kárahnjúkar dam is a concrete-faced rock fill dam (CFRD) type with a maximum height of 193m and, when completed it will be the highest of its kind in Europe and among the highest in the world. When full the level of the 57km2 the Hálslón storage reservoir will reach the height of 625m above […]
Mazar hydroelectric project, Ecuador
The Mazar hydroelectric power plant site is located in the south-eastern part of Ecuador and consists of the 2nd phase of the exploitation of the potential energy of the middle course of the Río Paute. The Mazar hydroelectric power project will be constructed immediately upstream of the Amaluza reservoir and will have a capacity of […]