Kariba Dam Rehabilitation Project
Kariba Dam Rehabilitation Project

Cliente

País

Ubicación

Inicio

Located on the Zambezi River, bordering Zambia and Zimbabwe, the Kariba Dam is a monumental structure constructed between 1956 and 1959, creating one of the largest artificial lakes globally.

Currently, renovations include enlarging and reshaping the plunging pool, necessitating the implementation of an additional monitoring system for better dam behavior control during excavations and dewatering activities.

Our responsibilities encompass supplying, installing, testing, and commissioning numerous Telelot units, alongside an automatic data logging system for existing piezometers.

Additionally, we’re automating uplift pressure measurements in the dam galleries. The project incorporates 12 Huggenberger telependulums model VDD2V4 Teletots, Sisgeo Up-lift Pressure Sensors (Piezometers and Manometers), 5000 meters of cables for piezometers, and 1200 meters of digital cables for the automatic system.

These efforts demonstrate our commitment to ensuring the safety and efficiency of the Kariba Dam infrastructure amidst ongoing renovations and improvements.

Prodotti usati:

Productos
relacionados

Sisgeo Piezometers: Comprehensive Solutions for Groundwater Monitoring

What You’ll Learn:

  • Detailed overview of Sisgeo’s range of piezometer technologies including vibrating wire and electric piezometers, outlining their operating principles, installation methods, and suitability for diverse site conditions.
  • Selection of piezometer filters, emphasizing materials and designs that conform to ISO 18674-4 standards.
  • Integration of piezometer data with automated acquisition systems.
  • Best practices for calibration and maintenance standards.

When:Thu, Jul 31, 2025 3:00 PM – 4:00 PM CEST
Language: English

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English