Ptolemaida coal mine waste disposal – The deepest DEX installation (150 m) – Greece

Rome Underground – Line C – Italy

Rome metro Line C runs through the city from North-West (Della Vittoria district) to the eastern suburb and is extending beyond the Grande Raccordo Anulare.Line C has a full-run of 25,6 km and 30 stations, passing through the old town centre.The Route will be characterised by the green colour. The interchanges with the other metro […]

Milan arret Forlanini surveillance des passages souterrains nord et sud

La réalisation de la gare Forlanini FS est liée à la réalisation du métro M4 de Milan (ligne 4). La gare Forlanini FS, qui a été ouverte en mai 2015, permet de relier le système des lignes ferroviaires de banlieue (S5, S6 et S9) à l’aéroport de Linate, grâce à la ligne M4. Lors des […]

Mae Saluam Dam Project, Chang Mai – Thailand

Mae Saluam Dam Project, located at Moo 11, Ban Sahakorn Plang 5, Pa Tum Sub-district, Phrao District, Chiang Mai Province, was proposed by the Regional Irrigation Office 1, the Royal Irrigation Department to store water for agriculture, consumption, and transmission to Mae Saluam Weir for solving drought problems. Courtesy of Sisgeo Asia Pacific Co., Ltd. […]

Fuerte San Fernando and Fuerte BaterÍa San José monitoring, Cartagena de Indias – Colombia

Il forte di San Fernando a Cartagena de Indias, nella zona meridionale dell’isola di Tierrabomba,ha sostituito il forte di San Luis che è stato distrutto durante l’assalto all’isola da parte delle truppe dell’Ammiraglio Vernon. La sua costruzione è iniziata nel 1753, seguendo i disegni preparati dall’ingegnere Juan Bautista Mac Evan. Ha bastioni circolari sormontati dalle […]

Center for Monitoring of impact of infrastructures on environment, Bucharest – Romania

Under EU financing, a Center for monitoring of impact of infrastructure on environment has been created within Technical University of Bucharest.The project was developed though an International Tender which was awarded to SISGEO. The aim was to provide Technical University with comprehensive list of geotechnical equipment, in order to allow University specialist to deal with […]

Bangkok Blue Line Extension Project, Contract 2 – Thailand

The MRT (Metropolitan Rapid Transit) Blue Line is being extended.The extension is expected to be completed in 2017 and by then the Blue Line will become a loop line around the centre of Bangkok, with the part on the western side of the Chao Praya River mainly being an elevated system and the other half […]

Doha Metro – Green Line – Settlement monitoring with MPBX – Qatar

The Doha Metro is part of the Qatar Integrated Rail Programme, which also includes the Lusail City LRT, 38.8 km with 36 stations to be completed in 2016; the West Bay people-mover, a 10 km dual-track, single-bore tunnel with 19 underground stations, linking the new Doha Convention Centre with the West Bay area; a high-speed […]

Réhabilitation de 6 barrages en Macédoine

6 centrales hydroélectriques de la République de Macédoine (détenues et exploitées par ELEM – JSC Macedonian Power Plants), d’une capacité installée totale de 528 MW, ont été réhabilitées en termes d’instrumentation de surveillance et d’automatisation des données. Les actifs hydroélectriques comprennent les cinq barrages en remblai avec noyau d’argile de Mavrovo, Spilje, Globocica, Tikves et […]

Third Bosphorus bridge – foundation monitoring works – Turkey

The 3rd Bosphorus Bridge will be the first of its kind in many respects. Once completed, the bridge will have the following features: The widest suspension bridge of the world with a width of 59 meters; the longest suspension bridge of the world with a rail system of 1,048 meters; a suspension bridge with the […]

Nam Gnouang Dam – Laos

The NG Dam, 480 m wide and 65 m high, has created the NG Reservoir, which stores the rains that fall in the area from May-October each year. The dam has five gates that are opened only to discharge water to avoid flood events during the wet season. In normal operation the dam releases water […]