Hongsa Mine Mouth Power Project and Nam Louk Dam – Laos

Hongsa Mine Mouth Power Project and Nam Louk Dam – Laos

The Hongsa Mine Mouth power project is the first and the biggest lignite-fired power plant to be developed in Lao PDR.The project is placed in Hongsa and Muang Nguen Districts of Xayaboury Province, Lao.The plant will be located on a 76.4km² concession area, which is leased for a period of 25 years.It will comprise a […]

Center for Monitoring of impact of infrastructures on environment, Bucharest – Romania

Under EU financing, a Center for monitoring of impact of infrastructure on environment has been created within Technical University of Bucharest.The project was developed though an International Tender which was awarded to SISGEO. The aim was to provide Technical University with comprehensive list of geotechnical equipment, in order to allow University specialist to deal with […]

Bangkok Blue Line Extension Project, Contract 2 – Thailand

The MRT (Metropolitan Rapid Transit) Blue Line is being extended.The extension is expected to be completed in 2017 and by then the Blue Line will become a loop line around the centre of Bangkok, with the part on the western side of the Chao Praya River mainly being an elevated system and the other half […]

Réhabilitation de 6 barrages en Macédoine

6 centrales hydroélectriques de la République de Macédoine (détenues et exploitées par ELEM – JSC Macedonian Power Plants), d’une capacité installée totale de 528 MW, ont été réhabilitées en termes d’instrumentation de surveillance et d’automatisation des données. Les actifs hydroélectriques comprennent les cinq barrages en remblai avec noyau d’argile de Mavrovo, Spilje, Globocica, Tikves et […]

The new Panama Canal

The project for the enlargement of the Panama Canal is nowadays considered one of the most important civil engineering works. The project includes the building of two new series of gates, on both the Pacific and the Atlantic side, to respond in a suitable and efficient way to the development of the maritime transportation industry. […]

Sogamoso hydroelectric project – Colombia

Sisgeo worked on the hydroelectric project on Sogamoso river, through Monitoriza, a company of Sisgeo group. Sisgeo supplied and installed all the equipments necessary for this project, located in the north-western area of Colombia, at about 40 km from Bucaramanga. The project concerns the building of a dam 190mt high and 300mt long, of a […]

Astana National Library – Kazakhstan

The new National Library is located adjacent to the Presidential Palace in Astana. Geometrically it is composed of two spherical sections with different diameters. The lower part is an opaque façade and the other, a huge glass dome. The primary structure of the building consists of 9 differently shaped slab levels situated on concrete columns. […]

Monitoring works for the 2014 Sochi Winter Olympic Games – Russia

Sisgeo, thanks to the collaboration with its Russian partners AGT Systems and GPIKO, furnished and installed all the equipments necessary to monitor the most important road and railway works that are under construction in Sochi area, that is the neural centre of 2014 Winter Olympics.The monitored works are: retaining walls for the protection of roads, […]

El Quimbo Hydroelectric project – Colombia

Impregilo is realising in Colombia the hydroelectric power plant of El Quimbo on Magdalena river (in Huila region), on behalf of EMGESA, that is the biggest electric company of the country. The agreement is worth about 250ml of euro. The power plant will have an installed capacity of 400MW. The project includes the building of […]

Molunghi landslide monitoring, Italy

Study and monitoring of Molunghi landslide The monitoring project of Molunghi landslide is the result of the cooperation between the Comune di Calice al Cornoviglio and the Road Department of La Spezia Province and it is began in consequence of the instability of both the provincial street and part of Monlunghi di Mezzo inhabitat during […]

Cleaning-up project of Panama City and Bay

The cleaning-up project of Panama City and Bay includes: Construction of Health Service networks Construction and rehabilitation of Collectors and Drive lines Interceptor system Plant for wastewater treatment. These elements will be developed to collect, transport and treat wastewater of Panama City which is currently discharged directly into the bay or rivers and streams in […]