FAQ#012 – How is important the function of the grout to the operation of the spider magnets?
The arms of the spider only keep the magnet in place while grouting, but the grout couples the magnet to the surroundig soil. Grout mix shall be controlled (ratio water/cement) during grouting operation according to the soil application.
FAQ#011 – Are the air bubbles present in the liquid mix cause of errors?
Sisgeo liquid mix is de-aired at factory and it is supplied sealed in special tank. However in the DSM reference gauge there is a high sensitive sensor which is able to monitor the weight of the liquid within the reservoir. In the case of the air bubbles come over decreasing the level of the liquid […]
FAQ#010 – Which is the freezing temperature of the Sisgeo liquid mix for H-Levels LLS and Multipoint Settlement Systems system liquid?
Sisgeo liquid is a de-aired water-glycole mix (70% – 30%). The freezing temperature is about -15°C.
Metro di Atene, Grecia
Dal gennaio 2000 è entrata gradualmente in funzione una nuova modalità di trasporto, moderna, veloce, confortevole, affidabile e sicura. Oggi sono in funzione 23 stazioni della metropolitana su entrambe le linee METRO: Linea 2 SEPOLIA – AGHIOS DIMITRIOS/ALEXANDROS PANAGOULIS (linea rossa) e linea 3. L’intero progetto è suddiviso in: Le stazioni del progetto Base: MONASTIRAKI-ETHNIKI […]
Marmaray Tunnel, Turkey
The Marmaray Project is the upgrading of approximately 76 kilometers of commuter rail system in Istanbul, connecting Halkalı on the European side with Gebze on the Asian side with an uninterrupted, modern, high-capacity commuter rail system. This Project is one of the major transportation infrastructure projects in the world at present.
Stazione della metropolitana di Genova – Italia
Questa tratta della metropolitana di Genova migliorerà il trasporto sia verso il Centro Espositivo del Porto Antico di Genova che verso il nuovo Acquario, migliorando nel frattempo sia le condizioni di traffico che la riorganizzazione della rete di trasporto di superficie. I lavori hanno richiesto importanti opere preliminari di consolidamento del terreno e sono stati […]
Linea B1 della metropolitana di Roma Roma, Italia
A Roma sono in corso grandi lavori per la realizzazione di un nuovo tratto della linea ferroviaria B già esistente, denominato “linea B1”. Questo nuovo ramo devia dalla Stazione di Bologna verso la zona di Africano e Montesacro, seguendo il percorso di viale XXI Aprile, piazza Annibaliano, viale Eritrea, viale Libia, via delle Valli e […]
Koohrang HPP , I. R. of IRAN
Project Name: Koohrang HPP Purpose of the projectGenerate: 128,000,000 Gwh/ y Electrical Energy Project location: IRAN-Shahre kord Client: I.W.P.C Contractor: Payab kosar – Canivo Dam Type: Earth Fill Dam Height above foundation: 15 m Crest level (above sea level): 2345.5 Crest length: 470 m Capacity of the Reservoir: 100,000 m<<3<< Foundation soil: SG-GC End of […]
Tangeh Halleh Dam, I.R. of Iran
Project Name: Haleh Dam Scopo del progetto: Irrigazione Project location: IRAN – Lorestan-Khoramabad Client: GHARB Regional Water Authority Contractor: SAZVAR CO. Dam Type: Homogenous Earth Dam Height above foundation: 42.55(m) Crest level(above sea level): 1217 Crest length: 195 (m) Capacity of the Reservoir: 3500000 m3 Foundation soil: Rock (shale) End of construction: Nov 2003
Meijaran Dam, I.R. of Iran
Project Name: Meijaran Dam Project location: IRAN- RAMSAR Client: Mazandaran & Golestan Regional Water Authority Contractor:Cotra Co. Dam Type: Homogeneous(clay) Height above foundation: 32 (m) Crest level (above sea level): 153 (m) Crest length: 622 (m) Capacity of the Reservoir: 40,000,000 m3 End of construction: June 2004
Diga di Ravedis, Italia
Nome del progetto: Diga di Ravedis Scopo del progetto: Controllo delle inondazioni, irrigazione ed energia Sede del progetto: Regione Friuli, Italia Cliente: Consorzio di Bonifica Cellina-Meduna Appaltatore: CORAV sponsor Impregilo S.p.a. Ingegnere: IN.CO. S.p.a. Tipo di diga: Calcestruzzo a gravità Altezza dalle fondamenta: 51 m Livello della cresta (sul livello del mare): 343 m Lunghezza […]
Golestan II Dam , I.R. of Iran
Nome del progetto: Diga Golestan II Scopo del progetto: Irrigazione Sede del progetto: IRAN-GOLESTAN Cliente: Mazandaran & Golestan Regional Water Authority Appaltatore: PORNAM CO. Tipo di diga: DIGA DI TERRA EMOGENA Altezza dalle fondamenta: 32 (m) Livello della cresta (sul livello del mare): 102m Lunghezza della cresta: 622 (m) Capacità del serbatoio: 36000000 m3 Fine […]