Gottard road tunnel, 2nd tube

Gottard road tunnel, 2nd tube

The first Gotthard road tunnel with a length of 17km has been in operation as a national road link between north Switzerland to the south, the canton of Ticino, since 1980. In order to ensure the functionality and safety of this important transport axis through the Alps, the first tube needs to be extensively repaired, […]

Fuel terminal monitoring

Supply of instrumentation for the monitoring of fuel terminal tanks in the city of Cuenca, Ecuador. The scope includes the monitoring of the settlements of structures through H-Level settlement cells and tiltmeters. The settlements and horizontal movements of the ground will be evaluated through IPI inclinometer probes and DEX S probes.

Grand Paris Express

The Grand Paris Express is the largest urban project in Europe with the construction of 200 km of automatic lines, as much as the current metro, and 68 stations. The four new lines of the Grand Paris Express (15, 16, 17 and 18), as well as the line 14 extended to the north and south, […]

Warsaw Metro Project – Line 2

The 6.5 km east-west route links Rondo Daszyńskiego and Dworzec Wileński includes seven stations and an 870 m tunnel under the Wisła River. The civil works began late in 2010 and became operative in March 2015. In 2016 the works for the extension toward east and west of the second line started, estimated schedule of […]

Ojo de Agua Hydroelectric project

The Ojo de Agua hydropower project is located close to the village El Carbon in the community of San Esteban (Olancho) in the north east of Honduras. The project will generate 109 GWh/year with an installed capacity of 22.5 MW, a discharge of 6.0 m³/s and a gross head of 418 m.The project consists of […]

Analoges Ketteninklinometer

Codes der Referenzprodukte: S411HA, S412HA, S411HD, S412HD Ketteninklinometer „In-place inclinometer (IPI)“ werden zur automatischen Erfassung von Verschiebungen im Boden, Fels und in geotechnischen Bauwerken eingesetzt. Die einzelnen Kettenelemente werden zu einer Messkette montiert und im Inklinometer-Messrohr hängend (Vertikal-Messkette) oder liegend (Horizontal-Messkette) eingebaut. Damit kann ein kontinuierliches Verschiebungsprofil quer zur Messlinie (Messrohr) automatisch gemessen werden. Die […]

Ulu Jelai Hydroelectric Project, Malaysia

The Project will involve the construction of an accumulation reservoir (Susu Reservoir) with two main water intakes, Telom Intake and Lemoi Intake, located upstream of Susu reservoir. The main part of the project is the construction of the Susu dam on the Bertram River, more than 80 m high and entirely built using the advanced […]

Rome Underground – Line C – Italy

Rome metro Line C runs through the city from North-West (Della Vittoria district) to the eastern suburb and is extending beyond the Grande Raccordo Anulare.Line C has a full-run of 25,6 km and 30 stations, passing through the old town centre.The Route will be characterised by the green colour. The interchanges with the other metro […]

Third Bosphorus bridge – foundation monitoring works – Turkey

The 3rd Bosphorus Bridge will be the first of its kind in many respects. Once completed, the bridge will have the following features: The widest suspension bridge of the world with a width of 59 meters; the longest suspension bridge of the world with a rail system of 1,048 meters; a suspension bridge with the […]

The new Panama Canal

The project for the enlargement of the Panama Canal is nowadays considered one of the most important civil engineering works. The project includes the building of two new series of gates, on both the Pacific and the Atlantic side, to respond in a suitable and efficient way to the development of the maritime transportation industry. […]