Meijaran Dam, I.R. of Iran
![](https://e0c48a74.rocketcdn.me/wp-content/uploads/2023/08/02_a9f06608c528c47623af9739f2d36e66.jpg)
Project Name: Meijaran Da Project location: IRAN- RAMSAR Client: Mazandaran & Golestan Regional Water Authority Contractor:Cotra Co. Dam Type: Homogeneous(clay) Height above foundation: 32 (m) Crest level (above sea level): 153 (m) Crest length: 622 (m) Capacity of the Reservoir: 40,000,000 m3 End of construction: June 2004
Ravedis Dam, Italy
![](https://e0c48a74.rocketcdn.me/wp-content/uploads/2023/08/04_38d4d13e9e8ce147950b86de601f0ce7.jpg)
Project Name: Ravedis Dam Purpose of the project: Flood control, irrigation and power Project location: Friuli Region, Italy Client: Consorzio di Bonifica Cellina-Meduna Contractor: CORAV sponsor Impregilo S.p.a. Engineer: IN.CO. S.p.a. Dam Type: Concrete Gravity Height above foundation: 51 m Crest level (above sea level): 343 m Crest length: 173 m Capacity of the Reservoir: […]
Komayestan Dam, I.R. of Iran
Project Name: Komayestan Dam Purpose of the project: Irrigation Project location: IRAN – Khorasan- Sabzevar Client: Khorasan Regional Water Authority Contractor: Kahar –e- Khorasan CO. Dam Type: Concrete gravity dam Height above foundation: 34.5 m Crest length: 835 m Capacity of the Reservoir: 1,200,000 m3 End of construction: February 2002
Golestan II Dam , I.R. of Iran
Project Name: Golestan II Dam Purpose of the project: Irrigation Project location: IRAN-GOLESTAN Client: Mazandaran & Golestan Regional Water Authority Contractor: PORNAM CO. Dam Type: HEMOGEN EARTH DAM Height above foundation: 32 (m) Crest level (above sea level): 102 Crest length: 622 (m) Capacity of the Reservoir: 36000000 m3 End of construction: 2005