Explore Eddyfi Technologies Product Lines ▼
Hongsa Mine Mouth Power Project and Nam Louk Dam – Laos
Hongsa Mine Mouth Power Project and Nam Louk Dam – Laos

Kunde

Land

Standort

Beginn

Ende

The Hongsa Mine Mouth power project is the first and the biggest lignite-fired power plant to be developed in Lao PDR.
The project is placed in Hongsa and Muang Nguen Districts of Xayaboury Province, Lao.
The plant will be located on a 76.4km² concession area, which is leased for a period of 25 years.
It will comprise a lignite-fired power plant, a lignite mine, a limestone mine and associated supporting infrastructure.
The plant will feature three 626 MW generating units producing a gross output of 1,878MW and a net available-for-sale power output of 1,653MW.
The plant is estimated to use approximately 14.3 million tonnes (Mt) of lignite a year, which will be sourced from the nearby Hongsa Mine.

Verwandte
Produkte

Explore Eddyfi Technologies product lines

Remote Monitoring Solutions Icon Remote Monitoring Solutions
Nuclear Steam Generator Icon Nuclear Steam Generators
Automated Vision System Icon Automated Vision Systems
Robotics Solutions Icon Robotics Solutions
ET/UT Solutions Icon ET & UT Solutions

Sisgeo Piezometers: Comprehensive Solutions for Groundwater Monitoring

What You’ll Learn:

  • Detailed overview of Sisgeo’s range of piezometer technologies including vibrating wire and electric piezometers, outlining their operating principles, installation methods, and suitability for diverse site conditions.
  • Selection of piezometer filters, emphasizing materials and designs that conform to ISO 18674-4 standards.
  • Integration of piezometer data with automated acquisition systems.
  • Best practices for calibration and maintenance standards.

When:Thu, Jul 31, 2025 3:00 PM – 4:00 PM CEST
Language: English

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English