Sardar Sarovar Dam Rehabilitation Project
Sardar Sarovar Dam Rehabilitation Project

Land

Standort

Beginn

The gravity concrete dam is 136m high with a crest length of 1300m. Over 300 Huggenberger sensors with Carlson technology were installed around 1994. In 2021, we carried out a functional test of the existing instruments then we upgraded the system from manual to semi-automatic by installing Hek-Mux Boxes.

In 2022, after the rehabilitation of the existing shafts we installed some new 76m long plumblines consisting of direct pendulums. We also supplied automatic Huggenberger Telelot VDD2v4 systems for measuring the horizontal deformations of the dam.

Products involved:

Verwandte
Produkte

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English