Rehabilitación de 6 presas en Macedonia

6 centrales hidroeléctricas de la República de Macedonia (propiedad de ELEM- JSC Macedonian Power Plants y explotadas por ella), con una capacidad total instalada de 528 MW, fueron rehabilitadas en cuanto a instrumentación de control y automatización de los datos. Los activos hidroeléctricos incluyen las cinco presas de terraplén con núcleo de arcilla de Mavrovo, […]

Nam Gnouang Dam – Laos

The NG Dam, 480 m wide and 65 m high, has created the NG Reservoir, which stores the rains that fall in the area from May-October each year. The dam has five gates that are opened only to discharge water to avoid flood events during the wet season. In normal operation the dam releases water […]

Proyecto hidroeléctrico Sogamoso – Colombia

Sisgeo trabajó en el proyecto hidroeléctrico del río Sogamoso, a través de Monitoriza, empresa del grupo Sisgeo. Sisgeo suministró e instaló todos los equipos necesarios para este proyecto, situado en la zona noroccidental de Colombia, a unos 40 km de Bucaramanga. El proyecto consiste en la construcción de una presa de 190 m de altura […]

Proyecto hidroeléctrico El Quimbo – Colombia

Impregilo está realizando en Colombia la central hidroeléctrica de El Quimbo sobre el río Magdalena (en la región de Huila), por cuenta de EMGESA, que es la mayor empresa eléctrica del país. El acuerdo asciende a unos 250 millones de euros. La central tendrá una capacidad instalada de 400 MW. El proyecto incluye la construcción […]

Minghetti Dam, Italy

Project Name: Minghetti Dam Purpose of the project: Irrigation Project location: Sardinia-Italy CostructorsImpresa: costruzioni Ing. G.B. Bosazzo Spa-Cagliari /Impresa di costruzioniOpere Specializzate (ICOS)-Milano Dam Type: ordinary gravity dam Height above foundation: 25 m Crest level (m.s.l.m): 364 m Crest length: 90 m Capacity of the Reservoir: 80.000 m3 End of construction: 1964 Client: Consorzio Bonifica […]

Koohrang HPP , I. R. of IRAN

Project Name: Koohrang HPP Purpose of the projectGenerate: 128,000,000 Gwh/ y Electrical Energy Project location: IRAN-Shahre kord Client: I.W.P.C Contractor: Payab kosar – Canivo Dam Type: Earth Fill Dam Height above foundation: 15 m Crest level (above sea level): 2345.5 Crest length: 470 m Capacity of the Reservoir: 100,000 m<<3<< Foundation soil: SG-GC End of […]

Mujib Dam, Jordan

Project Name: Mujib Dam Purpose of the project: Irrigation and Water Supply Project location: Madaba Region Hashemite: Kingdom of Jordan Client: Jordan Valley Authority (JVA) Contractor:Aegek-Hydrogradnja J.V. Consultant:Lahamayer Dam Type: RCC with earthfill abutments (clay core) Height above foundation: 62 m Crest level: 199 m a.s.l. Crest length: 750 m Capacity of the Reservoir: 35 […]

Wala Dam, Jordan

Project Name: Wala Dam Purpose of the project: Irrigation and Water Supply Project location: Madaba Region Hashemite: Kingdom of Jordan Client: Jordan Valley Authority (JVA) Contractor:Aegek-Hydrogradnja J.V. Dam Type:RCC with earthfill abutments (clay core) Height above foundation: 42 m Crest level: 524 m a.s.l. Crest length: 265 m Capacity of the Reservoir: 9.2 million cubic […]

Tangeh Halleh Dam, I.R. of Iran

Project Name: Haleh Dam Purpose of the project: Irrigation Project location: IRAN – Lorestan-Khoramabad Client: GHARB Regional Water Authority Contractor: SAZVAR CO. Dam Type: Homogenous Earth Dam Height above foundation: 42.55(m) Crest level(above sea level): 1217 Crest length: 195 (m) Capacity of the Reservoir: 3500000 m3 Foundation soil: Rock (shale) End of construction: Nov 2003

Meijaran Dam, I.R. of Iran

Project Name: Meijaran Dam Project location: IRAN- RAMSAR Client: Mazandaran & Golestan Regional Water Authority Contractor:Cotra Co. Dam Type: Homogeneous(clay) Height above foundation: 32 (m) Crest level (above sea level): 153 (m) Crest length: 622 (m) Capacity of the Reservoir: 40,000,000 m3 End of construction: June 2004

Ravedis Dam, Italy

Project Name: Ravedis Dam Purpose of the project: Flood control, irrigation and power Project location: Friuli Region, Italy Client: Consorzio di Bonifica Cellina-Meduna Contractor: CORAV sponsor Impregilo S.p.a. Engineer: IN.CO. S.p.a. Dam Type: Concrete Gravity Height above foundation: 51 m Crest level (above sea level): 343 m Crest length: 173 m Capacity of the Reservoir: […]