Sardar Sarovar Dam Rehabilitation Project

Sardar Sarovar, an imposing gravity concrete dam standing 136 meters high with a crest length of 1300 meters, underwent significant instrumentation upgrades. Originally equipped with over 300 Huggenberger sensors with Carlson technology installed around 1994, in 2021, we conducted a functional test of these existing instruments. Subsequently, we upgraded the system from manual to semi-automatic […]
El Quimbo Dam Rehabilitation Project

The El Quimbo Dam, located in Huila Department, Colombia, is a concrete-faced rock-fill hydroelectric facility positioned 1,300 meters upstream from the confluence of the Páez River with the Magdalena River. The accompanying powerhouse in Huila District has a 400-megawatt capacity, generating an estimated 2,216 gigawatt-hours annually. Installed Systems:
Betania Dam Rehabilitation Project

Betania HPP, situated in Huila, Colombia, boasts an installed capacity of 540.9 MW. Sisgeo Latinamèrica spearheaded the service and installation of the seismic monitoring system. Moreover, we undertook the following initiatives: Products involved:
Discover Sisgeo Group solution for the Rehabilitation and modernization of monitoring systems in dams on our new dedicated brochure

Dams are critical infrastructures designed to manage water resources and produce electricity, many of which have reached the end of their useful life or may require extensive rehabilitation. In 2021, UNU-INWEH (United Nations University – Institute for Water, Environment and Health) published a report titled « Ageing water infrastructure: An emerging global risk. » The authors urged […]
A.L.T.E.A. & GEOSTUDIO 2000 Sh.p.k.
A.L.T.E.A. & GEOSTUDIO 2000 Sh.p.k.
FAQ#123 – What should I do to update the firmware (FW) of the MIND readout?
With new firmware (FW) versions, the MIND app is also usually updated. So, the first thing to do is to check that you have the latest version of the MIND app on your mobile device. To do this, simply go to the Google Play Store or Apple App Store, search for SISGEO MIND and check […]
Hisorak dam

Hisorak dam, built on the Aksu River, is located in the Kashkadarya Region of the Republic of Uzbekistan. The reservoir is designed to provide water storage for the irrigation of Kashkadarya region. The reservoir has a rock dam with a maximum height of 140 m and a crest length of 528 m. Sisgeo, during the […]
Brunt Road LXR – new bridge monitoring
Sisgeo supplied instrumentation for the monitoring of a new road bridge over the rail line at Brunt Road in Beaconsfield, Australia. The Victorian Government aims to eliminate 110 dangerous and congested level crossings across Melbourne by the year 2030, marking the largest initiative of its kind in the history of Victoria. In fact, removing this […]
Urban regeneration: Former Municipal Theatre of Florence

Le projet de transformation de l’ancien Théâtre Municipal de Florence, entre Via Solferino, Via Magenta et Corso Italia, prévoit sa démolition presque complète et la construction de 160 appartements, de magasins, d’un gymnase et d’un parking souterrain. Il s’agit du projet de rénovation urbaine le plus important du centre de Florence, qui devrait réaménager un […]
Highway 1, the Trans-Canada Highway

The BC Ministry of Transportation and Infrastructure (MOTI) is widening Highway 1, the Trans-Canada Highway, by adding an additional lane in each direction in the areas east of Vancouver. Each section of highway presents new challenges for the construction work, and separate contractors are hired to complete each portion of the project. Instratus Monitoring Ltd. […]
Pont Nichupté – Cancún

Le projet concerne la construction d’un pont routier de 8,8 km enjambant le système de lagunes Nichupté. Son objectif principal est d’établir une nouvelle liaison routière à partir du rond-point Monumento Antigua Torre de Control, plus précisément au niveau de l’échangeur routier de Kabah où convergent les avenues Bonampak, Kabah et Tulum. Cette connexion reliera […]