Ralco Dam Rehabilitation Project

Ralco Dam Rehabilitation Project

The Ralco power plant, managed by Enel Generación Chile S.A., is a key energy source in the Biobío Region, utilizing the Biobío River’s power through an artificial dam with a capacity of 689 MW. Teaming up with Geosinergia LTD (our local partner), we’ve implemented several upgrades: These endeavors are geared toward enhancing the dam’s efficiency, […]

Mercatale Dam Rehabilitation Project

Field srl has successfully implemented data management and maintenance for the automatic topographic monitoring system at Mercatale Dam, overseen by the Public Authority Consorzio di Bonifica Marche. This sophisticated system comprises a total robotic station and a topographic network of macroprisms and clinometers connected to a data logger, facilitating real-time monitoring. Operating in fully automatic […]

El Quimbo Dam Rehabilitation Project

The El Quimbo Dam, located in Huila Department, Colombia, is a concrete-faced rock-fill hydroelectric facility positioned 1,300 meters upstream from the confluence of the Páez River with the Magdalena River. The accompanying powerhouse in Huila District has a 400-megawatt capacity, generating an estimated 2,216 gigawatt-hours annually. Installed Systems:

Barrage Afşar

Le barrage d’Afşar est un barrage en enrochement, à masque en béton. Il atteint une hauteur de 138 mètres et un volume de remplissage de 6 millions de m3.Le barrage est situé sur le ruisseau Ilıcapınar dans le district de Taşkent à Konya, en Turquie. Le barrage d’Afşar a commencé à retenir l’eau, qui sera […]

Ouldjet Mellegue Dam

The Ouldjet Mellègue dam is a Roller-Compacted Concrete Gravity Dam, located in northeastern Algeria about 13 km upstream of the city of Ouenza, in the Tébessa region. The site of the Ouldjet Mellègue dam is located at the outlet (Ouldjet) of the river Oued Mellègue, across the Jebel Krorza, in the north-east of Algeria, some […]

Limfjordstunnelen – Tunnel monitoring

Limfjordstunnelen is a Danish motorway tunnel which connects the highway in eastern Aalborg with the highway east of Nørresundby. Opened 6 May 1969, it was the country’s first motorway tunnel. The tunnel measures 582 metres (1,909 ft) in length, and 27.4 metres (90 ft) in width. Limfjordstunnelen comprises a 6-lane motorway, which is part of […]

Neckartal Dam project

In March 2020 the huge dam of Neckartal was inaugurated in Namibia. This dam is fundamental to bring water to the Namibian desert and irrigate 5 thousand hectares of land, stimulating the agriculture and creating employment. This work, realized with the RCC technology (Roller-Compacted Concrete), is the biggest dam of Namibia: 80m high, 518 long […]

Fuel terminal monitoring

Supply of instrumentation for the monitoring of fuel terminal tanks in the city of Cuenca, Ecuador. The scope includes the monitoring of the settlements of structures through H-Level settlement cells and tiltmeters. The settlements and horizontal movements of the ground will be evaluated through IPI inclinometer probes and DEX S probes.

“La Linea” Road Pass, Colombia

Tunnel “La Linea”, recently inaugurated, connects Colombia from the south-west to the center of the country, from Portal Bermellón in Cajamarca – Tolima, to Portal Galicia in Calarcá – Quindío. With a length of more than 8 kilometers, it is the longest road tunnel in the Americas. The road has two motorways exits and 13,4 […]

Forrestfield Airport Link

“The $1.86 billion Forrestfield-Airport Link is jointly funded by the Australian and Western Australian governments and will deliver a new rail service to the eastern suburbs of Perth – with three new stations at Belmont, Airport Central and Forrestfield.The rail link will connect with the existing Midland line near Bayswater Station and will run to […]

Warsaw Metro Project – Line 2

The 6.5 km east-west route links Rondo Daszyńskiego and Dworzec Wileński includes seven stations and an 870 m tunnel under the Wisła River. The civil works began late in 2010 and became operative in March 2015. In 2016 the works for the extension toward east and west of the second line started, estimated schedule of […]

Déformètres bétonnables à corde vibrante

Codes de référence: D233, LBSG Les déformètres à corde vibrante (également nommés LBSG – Long Base Strain Gauges) sont principalement conçus pour être intégrés dans le béton ou les barrages en BCR (béton compressé au rouleau) afin de mesurer la dilatation des joints. Le déformètre se compose d’un capteur de déplacement à corde vibrante logé […]