- Project Name: Ravedis Dam
- Purpose of the project: Flood control, irrigation and power
- Project location: Friuli Region, Italy
- Client: Consorzio di Bonifica Cellina-Meduna
- Contractor: CORAV sponsor Impregilo S.p.a.
- Engineer: IN.CO. S.p.a.
- Dam Type: Concrete Gravity
- Height above foundation: 51 m
- Crest level (above sea level): 343 m
- Crest length: 173 m
- Capacity of the Reservoir: 25 million cubic meter
- Foundation soil: Rock
- End of construction: November 2004