Warsaw Metro Project – Line 2
Warsaw Metro Project – Line 2

Client

Pays

Localisation

Début

The 6.5 km east-west route links Rondo Daszyńskiego and Dworzec Wileński includes seven stations and an 870 m tunnel under the Wisła River.

The civil works began late in 2010 and became operative in March 2015.

In 2016 the works for the extension toward east and west of the second line started, estimated schedule of works is 36 months The excavation is performed by TBM machines. Monitoring of tunnel, surface and adjacent building is carried on.

Produits
Connexes

Sisgeo Piezometers: Comprehensive Solutions for Groundwater Monitoring

What You’ll Learn:

  • Detailed overview of Sisgeo’s range of piezometer technologies including vibrating wire and electric piezometers, outlining their operating principles, installation methods, and suitability for diverse site conditions.
  • Selection of piezometer filters, emphasizing materials and designs that conform to ISO 18674-4 standards.
  • Integration of piezometer data with automated acquisition systems.
  • Best practices for calibration and maintenance standards.

When:Thu, Jul 31, 2025 3:00 PM – 4:00 PM CEST
Language: English

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English