Ralco Dam Rehabilitation Project

The Ralco power plant, managed by Enel Generación Chile S.A., is a key energy source in the Biobío Region, utilizing the Biobío River’s power through an artificial dam with a capacity of 689 MW. Teaming up with Geosinergia LTD (our local partner), we’ve implemented several upgrades: These endeavors are geared toward enhancing the dam’s efficiency, […]
Mercatale Dam Rehabilitation Project

Field srl has successfully implemented data management and maintenance for the automatic topographic monitoring system at Mercatale Dam, overseen by the Public Authority Consorzio di Bonifica Marche. This sophisticated system comprises a total robotic station and a topographic network of macroprisms and clinometers connected to a data logger, facilitating real-time monitoring. Operating in fully automatic […]
Sardar Sarovar Dam Rehabilitation Project

Sardar Sarovar, an imposing gravity concrete dam standing 136 meters high with a crest length of 1300 meters, underwent significant instrumentation upgrades. Originally equipped with over 300 Huggenberger sensors with Carlson technology installed around 1994, in 2021, we conducted a functional test of these existing instruments. Subsequently, we upgraded the system from manual to semi-automatic […]
El Quimbo Dam Rehabilitation Project

The El Quimbo Dam, located in Huila Department, Colombia, is a concrete-faced rock-fill hydroelectric facility positioned 1,300 meters upstream from the confluence of the Páez River with the Magdalena River. The accompanying powerhouse in Huila District has a 400-megawatt capacity, generating an estimated 2,216 gigawatt-hours annually. Installed Systems:
Betania Dam Rehabilitation Project

Betania HPP, situated in Huila, Colombia, boasts an installed capacity of 540.9 MW. Sisgeo Latinamèrica spearheaded the service and installation of the seismic monitoring system. Moreover, we undertook the following initiatives: Products involved:
Discover Sisgeo Group solution for the Rehabilitation and modernization of monitoring systems in dams on our new dedicated brochure

Dams are critical infrastructures designed to manage water resources and produce electricity, many of which have reached the end of their useful life or may require extensive rehabilitation. In 2021, UNU-INWEH (United Nations University – Institute for Water, Environment and Health) published a report titled “Ageing water infrastructure: An emerging global risk.” The authors urged that by 2050, […]
A.L.T.E.A. & GEOSTUDIO 2000 Sh.p.k.
A.L.T.E.A. & GEOSTUDIO 2000 Sh.p.k.
FAQ#123 – Cosa devo fare per aggiornare il firmware (FW) della centralina MIND?
Con le nuove versioni del firmware (FW), di solito viene aggiornata anche l’applicazione MIND. Pertanto, la prima cosa da fare è verificare che sul dispositivo mobile sia presente l’ultima versione dell’applicazione MIND. A tal fine, è sufficiente accedere al Google Play Store o all’Apple App Store, cercare SISGEO MIND e verificare se l’app presente sul […]
Hisorak dam

Hisorak dam, built on the Aksu River, is located in the Kashkadarya Region of the Republic of Uzbekistan. The reservoir is designed to provide water storage for the irrigation of Kashkadarya region. The reservoir has a rock dam with a maximum height of 140 m and a crest length of 528 m. Sisgeo, during the […]
Brunt Road LXR – new bridge monitoring
Sisgeo supplied instrumentation for the monitoring of a new road bridge over the rail line at Brunt Road in Beaconsfield, Australia. The Victorian Government aims to eliminate 110 dangerous and congested level crossings across Melbourne by the year 2030, marking the largest initiative of its kind in the history of Victoria. In fact, removing this […]