Diga di Afşar
La diga di Afşar è una diga rock fill con una superficie frontale rivestita in calcestruzzo, ha un’altezza di 138 metri e un volume di riempimento del corpo di 6 milioni di m3.La diga si trova sul torrente Ilıcapınar, nel distretto Taşkent di Konya, in Turchia. La diga di Afşar ha iniziato a raccogliere l’acqua, […]
Monitoring of the lava flow in Geldingadalir – Iceland
After a period of earthquakes and crustal movements, on 19th of March 2021 a volcanic eruption started in Geldingadalir, a valley in Fagradalsfjall Mountain, located in the Reykjanes Peninsula (Iceland). The eruption started as a fissure eruption but quickly developed into a shield volcano eruption, characterized by low effusion rates and lava flow from a […]
Celle di pressione totale per terreno
Codici di riferimento: L141, L143 LE CELLE DI PRESSIONE TOTALE PER TERRENI VENGONO UTILIZZATE PER CONTROLLARE LE PRESSIONI ALL’INTERNO DI RILEVATI O DIGHE IN TERRA E AL DI SOTTO DI FONDAZIONI, SERBATOI O PILE DI PONTI. Le celle di pressione Sisgeo sono costituite da un piatto circolare con un solo lato sensibile riempito di olio […]
Progetto idroelettrico Ulu Jelai, Malesia
Il progetto della centrale idroelettrica di Ulu Jelai prevede la costruzione e la messa in opera di una centrale idroelettrica con bacino di accumulazione. Il progetto include la costruzione di un bacino di accumulazione (Susu Reservoir) con due prese d’acqua principali, Telom Intake e Lemoi Intake, posizionate a monte del bacino di Susu. La parte […]
Diga di Avshar Hadimi – Turchia
Diga di Avshar Hadimi, Regione di Avshar, Turchia
FAQ#111 – Why I cannot read correctly my 4-20mA current loop gauge?
It could be a problem connected to the power supply given by the readout or logger. When the power supply is in the current loop (2-wire gauge) it is necessary to consider the effect of voltage drop across the shunt resistor on the voltage applied to the gauge. For example, suppose a 4-20mA gauge requires […]
Egnatia Odos Road – Athens, Greece
Egnatia Motorway was designed to the specifications of the Trans-European road network. Across Epirus and Northern Greece from Igoumenitsa to Evros, Egnatia Motorway is one of the largest road construction projects in Europe, 670 kilometres long and 24.5 metres wide.The realisation of this motorway requires the construction of: 50 road interchanges; 350 entrance / exit […]
FAQ#020 – How to obtain better results from pressure cells installed in earthfill?
The measurement of total pressure in geomechanics, even if is one of the most interesting parameters for the designer, is generally considered not reliable. Case histories report more nonsuccessful examples than for all the other types of measurements. Theoretical studies made by many researches have highlighted the critical parameters in the design and manufacturing of […]
Cantanghel idraulic tunnel, access tunnel and main tunnels – Italy
Project Name: Martignano Tunnel Purpose of the project: Variant of S.S.47 “Valsugana” Project location: Italy – Trento Client: TOTO Costruzioni Spa – Italy Contractor: Provincia di Trento – Italy Tunnel Type: Double highway tunnel Excavation method: TBM machine Total length: About 4.200 meter Tunnel diameter: 12 meter End of construction: December 2006
Metropolitana di Madrid M 30 – Spagna
L’autostrada M30 di Madrid, la circonvallazione interna della città, è al centro di un importante progetto di rinnovamento urbano. Attualmente la M30 è una “barriera” alla circolazione nelle aree urbane che attraversa. Nonostante la sua necessità come parte dell’infrastruttura stradale di Madrid, provoca un forte inquinamento dell’aria e del fiume Manzanares, a cui si avvicina. […]
Metropolitana di Brescia Italia
In una città del nord Italia, Brescia, è stato realizzato uno dei progetti più innovativi e complessi del Paese: una linea ferroviaria pubblica lunga circa 14 km, che attraversa il centro storico della città. I progressi nell’apertura di tutti i siti e gli edifici ottenuti oggi mostrano una situazione generale delle principali iniziative e attività […]
Mujib Dam, Jordan
Project Name: Mujib Dam Purpose of the project: Irrigation and Water Supply Project location: Madaba Region Hashemite: Kingdom of Jordan Client: Jordan Valley Authority (JVA) Contractor:Aegek-Hydrogradnja J.V. Consultant:Lahamayer Dam Type: RCC with earthfill abutments (clay core) Height above foundation: 62 m Crest level: 199 m a.s.l. Crest length: 750 m Capacity of the Reservoir: 35 […]