Explore Eddyfi Technologies Product Lines ▼
Avshar Hadimi Dam – Turkey

Rehabilitation of 6 dams in Macedonia

6 hydropower plants in the Republic of Macedonia (owned and operated by ELEM- JSC Macedonian Power Plants) with a total installed capacity of 528 MW, were rehabilitated in terms of monitoring instrumentation and automation of the data. The hydropower assets include the five embankment dams with clay core of Mavrovo, Spilje, Globocica, Tikves and Kozjak […]

Panama City metro project

Panama Metro is the rapid transit system of Panama City, Panama. It will be the first metro system in Central America. Construction of Line 1 of the Panama Metro started in February 2011 and is expected to be completed by February 2014. Line 1 will run from Albrook to Los Andes, and will include 12 […]

Istanbul Strait Road tube crossing project – Turkey

Istanbul Strait Road Tube Crossing Project is based in Istanbul and includes tunnel construction, road widening, access ramps and an upgrade of the current operational management and control systems. The intended purpose of this project is to provide a bi-directional, safe, robust, reliable, comfortable, durable and uninterrupted transportation of light vehicles under the Istanbul Strait […]

Third Bosphorus bridge – foundation monitoring works – Turkey

The 3rd Bosphorus Bridge will be the first of its kind in many respects. Once completed, the bridge will have the following features: The widest suspension bridge of the world with a width of 59 meters; the longest suspension bridge of the world with a rail system of 1,048 meters; a suspension bridge with the […]

Nam Gnouang Dam – Laos

The NG Dam, 480 m wide and 65 m high, has created the NG Reservoir, which stores the rains that fall in the area from May-October each year. The dam has five gates that are opened only to discharge water to avoid flood events during the wet season. In normal operation the dam releases water […]

The new Panama Canal

The project for the enlargement of the Panama Canal is nowadays considered one of the most important civil engineering works. The project includes the building of two new series of gates, on both the Pacific and the Atlantic side, to respond in a suitable and efficient way to the development of the maritime transportation industry. […]

Sogamoso hydroelectric project – Colombia

Sisgeo worked on the hydroelectric project on Sogamoso river, through Monitoriza, a company of Sisgeo group. Sisgeo supplied and installed all the equipments necessary for this project, located in the north-western area of Colombia, at about 40 km from Bucaramanga. The project concerns the building of a dam 190mt high and 300mt long, of a […]

Explore Eddyfi Technologies product lines

Automated Vision System Icon Automated Vision Systems
ET/UT Solutions Icon ET & UT Solutions
Nuclear Steam Generator Icon Nuclear Steam Generators
Remote Monitoring Solutions Icon Remote Monitoring Solutions
Robotics Solutions Icon Robotics Solutions

Vibrating Wire Strain Gauges:

Principles, Selection and Applications

Date: 26/03/2026
Time: 17:00 GMT+1
Duration: 45 minutes
Speaker: Eng. Julien Prouvot – Sisgeo
Language: English

Find out more: SISGEO FREE WEBINAR – Vibrating Wire Strain Gauges

Sisgeo Piezometers: Comprehensive Solutions for Groundwater Monitoring

What You’ll Learn:

  • Detailed overview of Sisgeo’s range of piezometer technologies including vibrating wire and electric piezometers, outlining their operating principles, installation methods, and suitability for diverse site conditions.
  • Selection of piezometer filters, emphasizing materials and designs that conform to ISO 18674-4 standards.
  • Integration of piezometer data with automated acquisition systems.
  • Best practices for calibration and maintenance standards.

When:Thu, Jul 31, 2025 3:00 PM – 4:00 PM CEST
Language: English

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English