Akhangaran Dam Rehabilitation Project

Akhangaran Dam Rehabilitation Project

Akhangaran reservoir is located on the territory of Tashkent in the Republic of Uzbekistan, near Angren city on Akhangaran River, further upstream from the northern edge of the opencast coal mine. The reservoir is designed to increase the availability of water supply for irrigation, water supply for the industrial and municipal complex and diversion of […]

Ralco Dam Rehabilitation Project

The Ralco power plant, managed by Enel Generación Chile S.A., is a key energy source in the Biobío Region, utilizing the Biobío River’s power through an artificial dam with a capacity of 689 MW. Teaming up with Geosinergia LTD (our local partner), we’ve implemented several upgrades: These endeavors are geared toward enhancing the dam’s efficiency, […]

Hisorak dam

Hisorak dam, built on the Aksu River, is located in the Kashkadarya Region of the Republic of Uzbekistan. The reservoir is designed to provide water storage for the irrigation of Kashkadarya region. The reservoir has a rock dam with a maximum height of 140 m and a crest length of 528 m. Sisgeo, during the […]

Nichupté-Brücke – Cancun

Das Projekt umfasst den Bau einer 8,80 km langen Fahrzeugbrücke, die das Lagunensystem von Nichupté überspannt. Das Hauptziel ist es, eine neue Straßenverbindung zu schaffen, die am Kreisverkehr Monumento Antigua Torre de Control beginnt, genauer gesagt am Verteiler Kabah, wo die Avenidas Bonampak, Kabah und Tulum zusammenlaufen. Diese Verbindung wird schließlich mit der Luis Donaldo […]

Waste water treatment plant Zimmerberg

The aging Horgen and Thalwil wastewater treatment plants, situated near Zürich, Switzerland, require extensive renovation to enhance their cleaning efficiency. The two plants are therefore to be merged. The new, modern Zimmerberg wastewater treatment plant (ARA) will treat the wastewater of up to 78,000 inhabitants and industry from 2027. In the event of an extreme […]

Afşar Damm

Der Afşar-Damm ist ein Steinschüttdamm mit einer betonierten Vorderseite, er hat eine Höhe von 138 Metern und ein Füllvolumen von 6 Millionen m3.Der Damm befindet sich am Ilıcapınar Fluss im Bezirk Taşkent von Konya in der Türkei. Der Afşar-Damm hat begonnen, Wasser zu speichern. Das Wasser, das im Afşar-Hadimi-Damm gespeichert wird, wird durch den Hadimi-Tunnel, […]

Ouldjet Mellegue Dam

The Ouldjet Mellègue dam is a Roller-Compacted Concrete Gravity Dam, located in northeastern Algeria about 13 km upstream of the city of Ouenza, in the Tébessa region. The site of the Ouldjet Mellègue dam is located at the outlet (Ouldjet) of the river Oued Mellègue, across the Jebel Krorza, in the north-east of Algeria, some […]

Gran Colombia Gold Mine

Supply and delivery of piezometric sensors for the different excavation fronts in the gold mine.Installed instruments: Supply of vibrating wire HD piezometers with ranges 1.0MPa and 3Pa with armoured cable. Wireless nodes with 5 channels for the automation of readings. Piezometer casings, blind and slotted, with 2’’ diameter

Limfjordstunnelen – Tunnel monitoring

Limfjordstunnelen is a Danish motorway tunnel which connects the highway in eastern Aalborg with the highway east of Nørresundby. Opened 6 May 1969, it was the country’s first motorway tunnel. The tunnel measures 582 metres (1,909 ft) in length, and 27.4 metres (90 ft) in width. Limfjordstunnelen comprises a 6-lane motorway, which is part of […]

Metro De Bogotá – Línea 1

Supply and install geotechnical instrumentation for the Patio Taller, and monitor the construction of the embankment, to keep track of the displacements in the terrain, the proposed works and the existing infrastructure, and the variable pore pressure. It includes the manual and automatic monitoring of the instruments installed for the entire time of construction of […]

Konsko Dam

The dam is located close to the border between North Macedonia and Greece. It’s an embankment rock-fill dam with a central asphalt-concrete core as watertight element. The dam will be 80 m height, the cross section on top will be 340 m long, with a total embankment volume is approx. 1.4 m3 The main purpose […]

Highway 4G Cúcuta – Pamplona

The Unión Vial Río Pamplonita Concessionaire is in charge of the Pamplona-Cúcuta dual carriageway, the most important road infrastructure work in Norte de Santander. This project is a solution to the border mobility between Colombia and Venezuela, as well as with the northeast of Colombia. The main characteristics of the project are: its length of […]