Explore Eddyfi Technologies Product Lines ▼
Cantanghel idraulic tunnel, access tunnel and main tunnels – Italy
Cantanghel idraulic tunnel, access tunnel and main tunnels – Italy

Kunde

Land

Standort

Beginn

Ende

Verwandte Dokumente

  • Project Name: Martignano Tunnel
  • Purpose of the project: Variant of S.S.47 “Valsugana”
  • Project location: Italy – Trento
  • Client: TOTO Costruzioni Spa – Italy
  • Contractor: Provincia di Trento – Italy
  • Tunnel Type: Double highway tunnel
  • Excavation method: TBM machine
  • Total length: About 4.200 meter
  • Tunnel diameter: 12 meter
  • End of construction: December 2006

Verwandte
Produkte

Explore Eddyfi Technologies product lines

Remote Monitoring Solutions Icon Remote Monitoring Solutions
Nuclear Steam Generator Icon Nuclear Steam Generators
Automated Vision System Icon Automated Vision Systems
Robotics Solutions Icon Robotics Solutions
ET/UT Solutions Icon ET & UT Solutions

Sisgeo Piezometers: Comprehensive Solutions for Groundwater Monitoring

What You’ll Learn:

  • Detailed overview of Sisgeo’s range of piezometer technologies including vibrating wire and electric piezometers, outlining their operating principles, installation methods, and suitability for diverse site conditions.
  • Selection of piezometer filters, emphasizing materials and designs that conform to ISO 18674-4 standards.
  • Integration of piezometer data with automated acquisition systems.
  • Best practices for calibration and maintenance standards.

When:Thu, Jul 31, 2025 3:00 PM – 4:00 PM CEST
Language: English

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English