Mollasadra Dam – Iran

Kunde

Land

Standort

Beginn

Ende

Verwandte Dokumente

GENERAL INFORMATION

Project Name: Mollasadra Dam
Purpose of the project: Agricultural & Energy production
Project location: IRAN – FARS
Client: FARS Regional Water Authority
Contractor: Melli Sakhteman. Co
Dam Type: Earth Fill Dam With Clay Core
Height above foundation: 72 m
Crest level (above sea level): 2122 (m)
Crest length: 630 m
Capacity of the Reservoir: 440,000,000 m3
End of construction January: 2006

INSTRUMENTS INSTALLED

The installation started during may 2004 and according to the dam construction schedule was terminated on construction underway
V.W. Piezometers No. 14 (Sisgeo models PK45S)
V.W. Pore pressure transducers No. 33 (Sisgeo model PK45A)
V.W. Earth pressure cells No. 42 (Sisgeo model L143D)
Inclinometer-settlement casings No. 8 (Sisgeo S141 flush coupled ABS casing)
Magnet rings No. 140 (Sisgeo model S131AF60000)
Inclinometer probe with portable readout unit No. 1 (Sisgeo model S242SV30)
Reservoir water level pressure transducers No. 1 (Sisgeo model P252R)
V-notch weir for seepage monitoring No. 5 (Sisgeo model QV45LS)
Staff gauges 70 meters
ADK-10 Automatic Data Acquisition System No. 1 cabinet (Sisgeo model ADK10CAB) with no. 5 multiplexers ( no. 160 channels)
Casagrande piezometers No. 20 (Sisgeo model P101)
Bench marks No. 30
Accelerographs No. 3

Courtesy of FARS Regional Water Authority

Verwandte
Produkte