Warsaw Metro Project – Line 2

Warsaw Metro Project – Line 2

The 6.5 km east-west route links Rondo Daszyńskiego and Dworzec Wileński includes seven stations and an 870 m tunnel under the Wisła River. The civil works began late in 2010 and became operative in March 2015. In 2016 the works for the extension toward east and west of the second line started, estimated schedule of […]

Clinómetro portátil TILLI

Códigos de referencia de los productos: SCLIN El TILLI es un inclinómetro portátil. Se compone de una estructura corrugada de acero inoxidable resistente con marco externo con sensor de aluminio interno que contiene la tecnología MEMS del inclinómetro. Las superficies de la trama se mecanizan para permitir un posicionamiento preciso de los inclinómetros durante las […]

Rome Underground – Line C – Italy

Rome metro Line C runs through the city from North-West (Della Vittoria district) to the eastern suburb and is extending beyond the Grande Raccordo Anulare.Line C has a full-run of 25,6 km and 30 stations, passing through the old town centre.The Route will be characterised by the green colour. The interchanges with the other metro […]

Monitoring works for the 2014 Sochi Winter Olympic Games – Russia

Sisgeo, thanks to the collaboration with its Russian partners AGT Systems and GPIKO, furnished and installed all the equipments necessary to monitor the most important road and railway works that are under construction in Sochi area, that is the neural centre of 2014 Winter Olympics.The monitored works are: retaining walls for the protection of roads, […]

Cleaning-up project of Panama City and Bay

The cleaning-up project of Panama City and Bay includes: Construction of Health Service networks Construction and rehabilitation of Collectors and Drive lines Interceptor system Plant for wastewater treatment. These elements will be developed to collect, transport and treat wastewater of Panama City which is currently discharged directly into the bay or rivers and streams in […]