Ulu Jelai Hydroelectric Project, Malaysia
The Project will involve the construction of an accumulation reservoir (Susu Reservoir) with two main water intakes, Telom Intake and Lemoi Intake, located upstream of Susu reservoir. The main part of the project is the construction of the Susu dam on the Bertram River, more than 80 m high and entirely built using the advanced […]
Rome Underground – Line C – Italy
Rome metro Line C runs through the city from North-West (Della Vittoria district) to the eastern suburb and is extending beyond the Grande Raccordo Anulare.Line C has a full-run of 25,6 km and 30 stations, passing through the old town centre.The Route will be characterised by the green colour. The interchanges with the other metro […]
Milan Metro Line 4 – Lorenteggio–Linate – Monitoring of the underpass of railway trails RFI between stations “Forlanini Q.RE” and “Forlanini FS” – Italy
The main aims of the M4 realization are: to realize a new diametrical line from East to West, in order to connect through the historical center some highly populated urban areas that are not well served by the network of public transport; to interconnect with the whole railway system, urban and regional; to realize a […]
Fuerte San Fernando and Fuerte BaterÍa San José monitoring, Cartagena de Indias – Colombia
Il forte di San Fernando a Cartagena de Indias, nella zona meridionale dell’isola di Tierrabomba,ha sostituito il forte di San Luis che è stato distrutto durante l’assalto all’isola da parte delle truppe dell’Ammiraglio Vernon. La sua costruzione è iniziata nel 1753, seguendo i disegni preparati dall’ingegnere Juan Bautista Mac Evan. Ha bastioni circolari sormontati dalle […]
Avshar Hadimi Dam – Turkey
Avshar Hadimi Dam, Avshar Region, Turkey
Nam Gnouang Dam – Laos
The NG Dam, 480 m wide and 65 m high, has created the NG Reservoir, which stores the rains that fall in the area from May-October each year. The dam has five gates that are opened only to discharge water to avoid flood events during the wet season. In normal operation the dam releases water […]
Proyecto hidroeléctrico Sogamoso – Colombia
Sisgeo trabajó en el proyecto hidroeléctrico del río Sogamoso, a través de Monitoriza, empresa del grupo Sisgeo. Sisgeo suministró e instaló todos los equipos necesarios para este proyecto, situado en la zona noroccidental de Colombia, a unos 40 km de Bucaramanga. El proyecto consiste en la construcción de una presa de 190 m de altura […]
Monitoring works for the 2014 Sochi Winter Olympic Games – Russia
Sisgeo, thanks to the collaboration with its Russian partners AGT Systems and GPIKO, furnished and installed all the equipments necessary to monitor the most important road and railway works that are under construction in Sochi area, that is the neural centre of 2014 Winter Olympics.The monitored works are: retaining walls for the protection of roads, […]
Molunghi landslide monitoring, Italy
Study and monitoring of Molunghi landslide The monitoring project of Molunghi landslide is the result of the cooperation between the Comune di Calice al Cornoviglio and the Road Department of La Spezia Province and it is began in consequence of the instability of both the provincial street and part of Monlunghi di Mezzo inhabitat during […]
FAQ#111 – Why I cannot read correctly my 4-20mA current loop gauge?
It could be a problem connected to the power supply given by the readout or logger. When the power supply is in the current loop (2-wire gauge) it is necessary to consider the effect of voltage drop across the shunt resistor on the voltage applied to the gauge. For example, suppose a 4-20mA gauge requires […]
Komayestan Dam, I.R. of Iran
Project Name: Komayestan Dam Purpose of the project: Irrigation Project location: IRAN – Khorasan- Sabzevar Client: Khorasan Regional Water Authority Contractor: Kahar –e- Khorasan CO. Dam Type: Concrete gravity dam Height above foundation: 34.5 m Crest length: 835 m Capacity of the Reservoir: 1,200,000 m3 End of construction: February 2002