MIND App
Codes der Referenzprodukte: LSZH, PVC MIND is the new Sisgeo app developed to manage MIND readout, in order to have a quick and handy interface with geotechnical and structural instrumentation. MIND has 4 main menu: configure, read, browse readings and back-up. It also has a “quick measure” button that permits to read analog and digital […]
Cerro del Águila Hydroelectric power plant
The Cerro del Águila HPP is a hydroelectric power plant located on the Mantaro River in the districts of Colcabamba and Surcubamba, within the Province of Tayacaja and Region of Huancavelica, in central Peru. The Project will be located downstream of the Mantaro hydroelectric complex. The Project is an independent activity from the Mantaro hydroelectric […]
Rome Underground – Line C – Italy
Rome metro Line C runs through the city from North-West (Della Vittoria district) to the eastern suburb and is extending beyond the Grande Raccordo Anulare.Line C has a full-run of 25,6 km and 30 stations, passing through the old town centre.The Route will be characterised by the green colour. The interchanges with the other metro […]
Sogamoso hydroelectric project – Colombia
Sisgeo worked on the hydroelectric project on Sogamoso river, through Monitoriza, a company of Sisgeo group. Sisgeo supplied and installed all the equipments necessary for this project, located in the north-western area of Colombia, at about 40 km from Bucaramanga. The project concerns the building of a dam 190mt high and 300mt long, of a […]
Monitoring works for the 2014 Sochi Winter Olympic Games – Russia
Sisgeo, thanks to the collaboration with its Russian partners AGT Systems and GPIKO, furnished and installed all the equipments necessary to monitor the most important road and railway works that are under construction in Sochi area, that is the neural centre of 2014 Winter Olympics.The monitored works are: retaining walls for the protection of roads, […]
FAQ#120 – Why can’t I connect the MIND readout to my mobile phone/tablet?
Make sure that ALL the following steps are checked:1. The batteries of the mobile phone/tablet and the MIND readout are charged2. You have installed the latest version of the MIND APP (check the Google Play Store)3. The version of the mobile phone/tablet’s operating system is Android 10 or higher4. The Bluetooth version of the mobile […]
FAQ#113 – Why I’m not able to connect my mobile/tablet to MIND readout?
Verify that the mobile phone/tablet used does have the minimum required features:Bluetooth Low Energy BLE 4.2APPLE iOS 14 or higherAndroid OS 9 (suggested Android OS 10 or higher) Then please check that the mobile phone/tablet has Bluetooth on and that the MIND unit has a sufficiently charged battery.
FAQ#112 – Which are the main troubleshooting that I have to know for MIND readout?
The up-date troubleshootings are available within MIND readout User Manual (see relevant DOWNLOD area or product page). The main troubleshootings are:
FAQ#032 – Which is the reading method of the new generation of SISGEO vibrating wire readouts and loggers?
For VW sensors Sisgeo has developed automatic algorithms to search for the resonant frequency in case of environmental noise or poor signal. In this way you can distinguish between the natural frequency of the sensor and the frequency of the noise, thereby reducing measurement errors and false alarms. This method also provides improvement in the […]
MIND Readout
MIND Readout Codes der Referenzprodukte: MIND MIND ist das von Grund auf neuentwickelte tragbare Mehrkanal-Auslesegerät, das alle analogen und digitalen Sisgeo-Instrumente ausließt. Es ist kompakt und sehr robust (IP65). Die drahtlose BLE-Technologie (Bluetooth Low Energy) ermöglicht eine schnelle und sichere Kommunikation mit der MIND app.MIND wird vollständig von der MIND app verwaltet und gesteuert.Im Zusammenspiel […]
Athens Metro, Greece
A new, modern, fast, comfortable, reliable and safe transport mode has been gradually been in operation since January 2000. Today, 23 Metro Stations are in operation at both METRO lines: Line 2 SEPOLIA – AGHIOS DIMITRIOS/ALEXANDROS PANAGOULIS (red Line) and Line 3. The whole Project is divided into: The Stations of the Base Project: MONASTIRAKI-ETHNIKI […]
Marmaray Tunnel, Turkey
The Marmaray Project is the upgrading of approximately 76 kilometers of commuter rail system in Istanbul, connecting Halkalı on the European side with Gebze on the Asian side with an uninterrupted, modern, high-capacity commuter rail system. This Project is one of the major transportation infrastructure projects in the world at present.