Rome Underground – Line C – Italy

Rome Underground – Line C – Italy

Rome metro Line C runs through the city from North-West (Della Vittoria district) to the eastern suburb and is extending beyond the Grande Raccordo Anulare.Line C has a full-run of 25,6 km and 30 stations, passing through the old town centre.The Route will be characterised by the green colour. The interchanges with the other metro […]

Sogamoso hydroelectric project – Colombia

Sisgeo worked on the hydroelectric project on Sogamoso river, through Monitoriza, a company of Sisgeo group. Sisgeo supplied and installed all the equipments necessary for this project, located in the north-western area of Colombia, at about 40 km from Bucaramanga. The project concerns the building of a dam 190mt high and 300mt long, of a […]

Monitoring works for the 2014 Sochi Winter Olympic Games – Russia

Sisgeo, thanks to the collaboration with its Russian partners AGT Systems and GPIKO, furnished and installed all the equipments necessary to monitor the most important road and railway works that are under construction in Sochi area, that is the neural centre of 2014 Winter Olympics.The monitored works are: retaining walls for the protection of roads, […]

FAQ#120 – Why can’t I connect the MIND readout to my mobile phone/tablet?

Make sure that ALL the following steps are checked:1. The batteries of the mobile phone/tablet and the MIND readout are charged2. You have installed the latest version of the MIND APP (check the Google Play Store)3. The version of the mobile phone/tablet’s operating system is Android 10 or higher4. The Bluetooth version of the mobile […]

FAQ#113 – Why I’m not able to connect my mobile/tablet to MIND readout?

Verify that the mobile phone/tablet used does have the minimum required features:Bluetooth Low Energy BLE 4.2APPLE iOS 14 or higherAndroid OS 9 (suggested Android OS 10 or higher) Then please check that the mobile phone/tablet has Bluetooth on and that the MIND unit has a sufficiently charged battery.

MIND Readout

MIND Readout Codes der Referenzprodukte: MIND MIND ist das von Grund auf neuentwickelte tragbare Mehrkanal-Auslesegerät, das alle analogen und digitalen Sisgeo-Instrumente ausließt. Es ist kompakt und sehr robust (IP65). Die drahtlose BLE-Technologie (Bluetooth Low Energy) ermöglicht eine schnelle und sichere Kommunikation mit der MIND app.MIND wird vollständig von der MIND app verwaltet und gesteuert.Im Zusammenspiel […]

Athens Metro, Greece

A new, modern, fast, comfortable, reliable and safe transport mode has been gradually been in operation since January 2000. Today, 23 Metro Stations are in operation at both METRO lines: Line 2 SEPOLIA – AGHIOS DIMITRIOS/ALEXANDROS PANAGOULIS (red Line) and Line 3. The whole Project is divided into: The Stations of the Base Project: MONASTIRAKI-ETHNIKI […]

Marmaray Tunnel, Turkey

The Marmaray Project is the upgrading of approximately 76 kilometers of commuter rail system in Istanbul, connecting Halkalı on the European side with Gebze on the Asian side with an uninterrupted, modern, high-capacity commuter rail system. This Project is one of the major transportation infrastructure projects in the world at present.

Madrid Subway M 30 – Spain

The Madrid M30 motorway, the inner ring road of the city, is at the centre of a major urban renewal project. At the current time the M30 is a ‘barrier’ to movement in the urban areas it runs through. Despite its necessity as part of the road infrastructure of Madrid it causes much pollution to […]

Mujib Dam, Jordan

Project Name: Mujib Dam Purpose of the project: Irrigation and Water Supply Project location: Madaba Region Hashemite: Kingdom of Jordan Client: Jordan Valley Authority (JVA) Contractor:Aegek-Hydrogradnja J.V. Consultant:Lahamayer Dam Type: RCC with earthfill abutments (clay core) Height above foundation: 62 m Crest level: 199 m a.s.l. Crest length: 750 m Capacity of the Reservoir: 35 […]