Ituango Hydroelectric project
The 2.400MW Ituango hydroelectric project will be the largest hydropower plant in Colombia. The plant is being built on the banks of Cauca River. The project is located in the northwestern region of Antioquia, about 170km north of the Colombian city of Medellin. The project is a part of the initiative undertaken to exploit the […]
Forrestfield Airport Link
“The $1.86 billion Forrestfield-Airport Link is jointly funded by the Australian and Western Australian governments and will deliver a new rail service to the eastern suburbs of Perth – with three new stations at Belmont, Airport Central and Forrestfield.The rail link will connect with the existing Midland line near Bayswater Station and will run to […]
Warsaw Metro Project – Line 2
The 6.5 km east-west route links Rondo Daszyńskiego and Dworzec Wileński includes seven stations and an 870 m tunnel under the Wisła River. The civil works began late in 2010 and became operative in March 2015. In 2016 the works for the extension toward east and west of the second line started, estimated schedule of […]
Digital-Inklinometer mit MEMS-Sensoren
Codes der Referenzprodukte: S242DV, S2RC, CDL300, S21ST Das digitale Bohrloch-Inklinometer basiert auf MEMS-Sensorik und ist das am weitesten entwickelte Bohrloch-Inklinometersystem von Sisgeo. Das Bohrloch-Inklinometer dient der Erfassung und Lokalisierung von Bewegungen und Verschiebungen in der Geotechnik. Die Inklinometersonde besteht aus rostbeständiem Stahl und ist weitgehend aus einem Stück gefertigt. Dadurch kann langzeit eine hohe Widerstandsfähigkeit […]
Urban Tunnelling: Hakata station of the Fukuoka city subway – Japan
For the tunnel excavation of the Hakata station of the Fukuoka city subway in Japan partial excavation was carried out. A road with heavy traffic and different structures , as subground car park, gas pipelines, important sewers, are situated above the tunnel construction. Taking into account constraints as shallow overburden and unconsolidated ground above the […]
Xayaburi Hydroelectric Power Project – Laos
The Xayaburi Dam is a hydroelectric dam under construction on the Lower Mekong River approximately 30 kilometres east of Xayaburi (Sainyabuli) town in northern Laos. The main purpose of the dam is to produce hydroelectric power.With a planned capacity of 1,295 MW – of which 1,220 MW will be sold to the Electricity Generating Authority […]
Milan Metro Line 4 – Lorenteggio–Linate – Monitoring of the underpass of railway trails RFI between stations “Forlanini Q.RE” and “Forlanini FS” – Italy
The main aims of the M4 realization are: to realize a new diametrical line from East to West, in order to connect through the historical center some highly populated urban areas that are not well served by the network of public transport; to interconnect with the whole railway system, urban and regional; to realize a […]
Hongsa Mine Mouth Power Project and Nam Louk Dam – Laos
The Hongsa Mine Mouth power project is the first and the biggest lignite-fired power plant to be developed in Lao PDR.The project is placed in Hongsa and Muang Nguen Districts of Xayaboury Province, Lao.The plant will be located on a 76.4km² concession area, which is leased for a period of 25 years.It will comprise a […]
Center for Monitoring of impact of infrastructures on environment, Bucharest – Romania
Under EU financing, a Center for monitoring of impact of infrastructure on environment has been created within Technical University of Bucharest.The project was developed though an International Tender which was awarded to SISGEO. The aim was to provide Technical University with comprehensive list of geotechnical equipment, in order to allow University specialist to deal with […]
Bangkok Blue Line Extension Project, Contract 2 – Thailand
The MRT (Metropolitan Rapid Transit) Blue Line is being extended.The extension is expected to be completed in 2017 and by then the Blue Line will become a loop line around the centre of Bangkok, with the part on the western side of the Chao Praya River mainly being an elevated system and the other half […]
FAQ#118 – Is it possible to use the reference reading (zero reading) taken with a digital inclinometer probe as a reference reading for another digital inclinometer probe?
No, this is not possible.Sisgeo calibrates each probe individually, but each probe has its own small different properties, that have a certain influence on the readings. The international standard ISO 18674-3, describing the reference reading, states that:„It is good practice to take an additional reference measurement with an independent probe that can be used as […]
FAQ#075 – What parameters are saved in SISGEO digital sensors? What information must the Customer provide when ordering?
All SISGEO digital sensors (e.g. IPI, BH Profile, MD Profile, LT Inclibus, Tilt-meter, RDS, H-Level, etc.) use the Modbus communication protocol over RS-485 serial. SISGEO digital sensors are connected to each other with a single signal cable. The parameters that are configured at the factory for each digital sensor are as follows: Upon confirmation of […]