Akhangaran Dam Rehabilitation Project

Akhangaran Dam Rehabilitation Project

Akhangaran reservoir is located on the territory of Tashkent in the Republic of Uzbekistan, near Angren city on Akhangaran River, further upstream from the northern edge of the opencast coal mine. The reservoir is designed to increase the availability of water supply for irrigation, water supply for the industrial and municipal complex and diversion of […]

Ralco Dam Rehabilitation Project

The Ralco power plant, managed by Enel Generación Chile S.A., is a key energy source in the Biobío Region, utilizing the Biobío River’s power through an artificial dam with a capacity of 689 MW. Teaming up with Geosinergia LTD (our local partner), we’ve implemented several upgrades: These endeavors are geared toward enhancing the dam’s efficiency, […]

Hisorak dam

Hisorak dam, built on the Aksu River, is located in the Kashkadarya Region of the Republic of Uzbekistan. The reservoir is designed to provide water storage for the irrigation of Kashkadarya region. The reservoir has a rock dam with a maximum height of 140 m and a crest length of 528 m. Sisgeo, during the […]

Puente Nichupté – Cancún

El proyecto contempla la construcción de un puente vehicular de 8,80 kilómetros sobre la laguna de Nichupté. Su objetivo principal es establecer una nueva conexión vial a partir de la rotonda del Monumento Antigua Torre de Control, específicamente en el distribuidor vial Kabah donde convergen las avenidas Bonampak, Kabah y Tulum. Esta conexión finalmente enlazará […]

Waste water treatment plant Zimmerberg

The aging Horgen and Thalwil wastewater treatment plants, situated near Zürich, Switzerland, require extensive renovation to enhance their cleaning efficiency. The two plants are therefore to be merged. The new, modern Zimmerberg wastewater treatment plant (ARA) will treat the wastewater of up to 78,000 inhabitants and industry from 2027. In the event of an extreme […]

Mina Gran Colombia Gold

Suministro y entrega de sensores piezométricos para los diferentes frentes de excavación en la mina de oro.Instrumentos instalados: Suministro de piezómetros en cuerda vibrante HD de 1.0 y 3.0 M Pa, con cable armado. Nodos inalámbricos de 5 canales, para la automatización de las lecturas. Tubería piezométrica lisa y ranurada de 2”.

Metro De Bogotá – Línea 1

Suministrar e instalar la instrumentación geotécnica del patio taller, y monitorear la construcción del terraplén, para hacer un seguimiento a los desplazamientos en el terreno, las obras propuestas y la infraestructura existente, y de la presión de poros variable. Incluye el monitoreo manual y automático de los instrumentos instalados por la totalidad del tiempo de […]

Highway 4G Cúcuta – Pamplona

The Unión Vial Río Pamplonita Concessionaire is in charge of the Pamplona-Cúcuta dual carriageway, the most important road infrastructure work in Norte de Santander. This project is a solution to the border mobility between Colombia and Venezuela, as well as with the northeast of Colombia. The main characteristics of the project are: its length of […]

Grand Paris Express

The Grand Paris Express is the largest urban project in Europe with the construction of 200 km of automatic lines, as much as the current metro, and 68 stations. The four new lines of the Grand Paris Express (15, 16, 17 and 18), as well as the line 14 extended to the north and south, […]

FAQ#116 – How do I configure a WR-Log digital node to read RS485 Sisgeo TIMED sensors?

Sisgeo digital instruments can operate in two powering modes: TIMED or ALWAYS-ON (for more information see F.A.Q.#094).A string of mixed instruments consisting of TIMED gauges and ALWAYS-ON gauges cannot work.The first thing to do is therefore to check that ALL connected instruments in your array are set to TIMED mode.You can check the powering mode […]