HOME / PROJECTS /

Neckartal Dam project

Neckartal Dam project

In March 2020 the huge dam of Neckartal was inaugurated in Namibia. This dam is fundamental to bring water to the Namibian desert and irrigate 5 thousand hectares of land, stimulating the agriculture and creating employment.This work, realized with the RCC technology (Roller-Compacted Concrete), is the biggest dam of Namibia: 80m high, 518 long and […]

Vibrating Wire Deformation Meters

Reference products codes: D233, LBSG VW deformation meters (also named LBSG – Long Base Strain Gauges) are mainly designed to be enbedded into concrete or RCC dams in order to measure expansion of induced joints. Deformation meter consists of a vibrating wire displacement transducer housed into a PVC tube having a steel flange on each […]