Sisgeo suggest that frozen water within the inclinometer casings is to be avoided due to following reasons: – Ice within the casing will affect functionality of the systems by blocking the individual probes;– Mechanical damages can occur to the probes, but also to the inclinometer casing due to the expansion of frozen water In any […]

FAQ#081 – Which is the maximum cable length for DEX and DEX-S probes?

The maximum instrument cable length from DEX probe to datalogger is 200 m. If the automatic data acquisition system includes distributed external multiplexer box, the maximum cable length is 200m from DEX probe to multiplexer box plus 200m from multiplexer box to OMNIAlog (in total 400m).

Egnatia Odos Road – Athens, Greece

Egnatia Motorway was designed to the specifications of the Trans-European road network. Across Epirus and Northern Greece from Igoumenitsa to Evros, Egnatia Motorway is one of the largest road construction projects in Europe, 670 kilometres long and 24.5 metres wide.The realisation of this motorway requires the construction of: 50 road interchanges; 350 entrance / exit […]

FAQ#031 – Is the DEX system suitable for in-place applications?

DEX system has been designed for automatic soil settlement monitoring (vertical movement) in unattended location. DEX system consists of a string of DEX probes installed in borehole within a ABS inclinometer casing. DEX-S, the combined inclinometer-settlement probe, provides both horizontal movements (X, Y-axis) and vertical settlement (Z-axis) for 3-D borehole automatic profile monitoring.

Athens Metro, Greece

A new, modern, fast, comfortable, reliable and safe transport mode has been gradually been in operation since January 2000. Today, 23 Metro Stations are in operation at both METRO lines: Line 2 SEPOLIA – AGHIOS DIMITRIOS/ALEXANDROS PANAGOULIS (red Line) and Line 3. The whole Project is divided into: The Stations of the Base Project: MONASTIRAKI-ETHNIKI […]

Cantanghel idraulic tunnel, access tunnel and main tunnels – Italy

Project Name: Martignano Tunnel Purpose of the project: Variant of S.S.47 “Valsugana” Project location: Italy – Trento Client: TOTO Costruzioni Spa – Italy Contractor: Provincia di Trento – Italy Tunnel Type: Double highway tunnel Excavation method: TBM machine Total length: About 4.200 meter Tunnel diameter: 12 meter End of construction: December 2006

Marmaray Tunnel, Turkey

The Marmaray Project is the upgrading of approximately 76 kilometers of commuter rail system in Istanbul, connecting Halkalı on the European side with Gebze on the Asian side with an uninterrupted, modern, high-capacity commuter rail system. This Project is one of the major transportation infrastructure projects in the world at present.

Genova Underground Station – Italy

This section of the Genoa subway will improve the transportation to both the Old Genoa Harbour Exhibition Centre and the new Aquarium, improving in the meantime both traffic conditions and the re-organisation of the surface transport network. Works have required important preliminary soil consolidation works and were executed in a heavily populated urban area, without […]

Brescia Metro Italy

In a northern Italian city named Brescia there is one of the most innovative and complex project of the country: a public railway line of about 14 Km longer, that pass through the historical centre of the city. The progress in opening of all the sites and building obtained nowadays show a general situation of […]

Chuquicamata Mine (Codelco), Chile

Chuquicamata is an opencast copper mine, where a relatively poor copper ore is mined in impressive huge amounts. Modern mining and smelting technology allows the usage of such depostits at unrivaled low costs. The ore contains only between 1,13% and 1,18% metals, most of it copper, but also molybdenum and selenium in a very low […]