El Quimbo Hydroelectric project – Colombia

El Quimbo Hydroelectric project – Colombia

Impregilo is realising in Colombia the hydroelectric power plant of El Quimbo on Magdalena river (in Huila region), on behalf of EMGESA, that is the biggest electric company of the country. The agreement is worth about 250ml of euro. The power plant will have an installed capacity of 400MW. The project includes the building of […]

Minghetti Dam, Italy

Project Name: Minghetti Dam Purpose of the project: Irrigation Project location: Sardinia-Italy CostructorsImpresa: costruzioni Ing. G.B. Bosazzo Spa-Cagliari /Impresa di costruzioniOpere Specializzate (ICOS)-Milano Dam Type: ordinary gravity dam Height above foundation: 25 m Crest level (m.s.l.m): 364 m Crest length: 90 m Capacity of the Reservoir: 80.000 m3 End of construction: 1964 Client: Consorzio Bonifica Sardegna Centrale

Koohrang HPP , I. R. of IRAN

Project Name: Koohrang HPP Purpose of the projectGenerate: 128,000,000 Gwh/ y Electrical Energy Project location: IRAN-Shahre kord Client: I.W.P.C Contractor: Payab kosar – Canivo Dam Type: Earth Fill Dam Height above foundation: 15 m Crest level (above sea level): 2345.5 Crest length: 470 m Capacity of the Reservoir: 100,000 m<<3<< Foundation soil: SG-GC End of construction: Sep 2004

Mujib Dam, Jordan

Project Name: Mujib Dam Purpose of the project: Irrigation and Water Supply Project location: Madaba Region Hashemite: Kingdom of Jordan Client: Jordan Valley Authority (JVA) Contractor:Aegek-Hydrogradnja J.V. Consultant:Lahamayer Dam Type: RCC with earthfill abutments (clay core) Height above foundation: 62 m Crest level: 199 m a.s.l. Crest length: 750 m Capacity of the Reservoir: 35 million cubic meter Volume of the concrete: 800.000 cubic meter […]

Wala Dam, Jordan

Project Name: Wala Dam Purpose of the project: Irrigation and Water Supply Project location: Madaba Region Hashemite: Kingdom of Jordan Client: Jordan Valley Authority (JVA) Contractor:Aegek-Hydrogradnja J.V. Dam Type:RCC with earthfill abutments (clay core) Height above foundation: 42 m Crest level: 524 m a.s.l. Crest length: 265 m Capacity of the Reservoir: 9.2 million cubic meter Foundation soil: Bitominous Lime Stone End of construction: January […]

Tangeh Halleh Dam, I.R. of Iran

Project Name: Haleh Dam Purpose of the project: Irrigation Project location: IRAN – Lorestan-Khoramabad Client: GHARB Regional Water Authority Contractor: SAZVAR CO. Dam Type: Homogenous Earth Dam Height above foundation: 42.55(m) Crest level(above sea level): 1217 Crest length: 195 (m) Capacity of the Reservoir: 3500000 m3 Foundation soil: Rock (shale) End of construction: Nov 2003

Meijaran Dam, I.R. of Iran

Project Name: Meijaran Dam Project location: IRAN- RAMSAR Client: Mazandaran & Golestan Regional Water Authority Contractor:Cotra Co. Dam Type: Homogeneous(clay) Height above foundation: 32 (m) Crest level (above sea level): 153 (m) Crest length: 622 (m) Capacity of the Reservoir: 40,000,000 m3 End of construction: June 2004

Ravedis Dam, Italy

Project Name: Ravedis Dam Purpose of the project: Flood control, irrigation and power Project location: Friuli Region, Italy Client: Consorzio di Bonifica Cellina-Meduna Contractor: CORAV sponsor Impregilo S.p.a. Engineer: IN.CO. S.p.a. Dam Type: Concrete Gravity Height above foundation: 51 m Crest level (above sea level): 343 m Crest length: 173 m Capacity of the Reservoir: 25 million cubic meter Foundation soil: Rock End of construction: November 2004

Komayestan Dam, I.R. of Iran

Project Name: Komayestan Dam Purpose of the project: Irrigation Project location: IRAN – Khorasan- Sabzevar Client: Khorasan Regional Water Authority Contractor: Kahar –e- Khorasan CO. Dam Type:  Concrete gravity dam Height above foundation: 34.5 m Crest length: 835 m Capacity of the Reservoir: 1,200,000 m3 End of construction: February 2002

Golestan II Dam , I.R. of Iran

Project Name: Golestan II Dam Purpose of the project: Irrigation Project location: IRAN-GOLESTAN Client: Mazandaran & Golestan Regional Water Authority Contractor: PORNAM CO. Dam Type: HEMOGEN EARTH DAM Height above foundation: 32 (m) Crest level (above sea level): 102 Crest length: 622 (m) Capacity of the Reservoir: 36000000 m3 End of construction: 2005

Tangab Dam, I.R. of Iran

Project Name: Tangab Dam Purpose of the project: Irrigotion & Resort Area Project location: IRAN – Shiraz Client: FARS Regional Water Authority Contractor:EV- YOL CO. Dam Type: Rock Fill With Chimney Clay Core Height above foundation: 51 m Crest length: 270 m Capacity of the Reservoir: 130,000,000 m3 End of construction: Under Construction Will Be Finished by 2007

Bidvaz Esfarayen Dam, Islamic Republic of IRAN

Project Name: Bidvaz Esfarayen Dam Purpose of the project: Agricolture & Irrigation Project location: Khorasan- Esfarayen Client: Khorasan Regional Water Authority Contractor: Gostaresh Nosazi Sanayee Iran CO. Dam Type: Earth Fill Dam With Clay Core Height above foundation: 60 (m) Crest level (above sea level): 1534 Crest length: 113 (m) End of construction: June 2005