HOME / PROJECTS /

Betania Dam Rehabilitation Project
Betania Dam Rehabilitation Project

Client

Country

Location

Start

Betania HPP, situated in Huila, Colombia, boasts an installed capacity of 540.9 MW. Sisgeo Latinamèrica spearheaded the service and installation of the seismic monitoring system. Moreover, we undertook the following initiatives:

  • Rehabilitation of 8 inclinometers;
  • Execution of general civil works and construction of a new facility;
  • Replacement and installation of 3 new wireless accelerometers, along with setting up associated servers and dynamic system management software. These endeavors signify our commitment to enhancing infrastructure efficiency and safety in Colombia’s energy landscape.

Products involved:

  • Dynamic systems wireless Sara Srl.

Related
products

Sisgeo Piezometers: Comprehensive Solutions for Groundwater Monitoring

What You’ll Learn:

  • Detailed overview of Sisgeo’s range of piezometer technologies including vibrating wire and electric piezometers, outlining their operating principles, installation methods, and suitability for diverse site conditions.
  • Selection of piezometer filters, emphasizing materials and designs that conform to ISO 18674-4 standards.
  • Integration of piezometer data with automated acquisition systems.
  • Best practices for calibration and maintenance standards.

When:Thu, Jul 31, 2025 3:00 PM – 4:00 PM CEST
Language: English

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English