HOME / PROJECTS /

Túnel de Crespo – Ruta Costera
Túnel de Crespo – Ruta Costera

Client

Country

Location

The Coastal Route has a length of 146.6 kilometers, broken down as follows: Cartagena – Barranquilla 109.9 kilometers (Section 1) and Circunvalar de la Prosperidad between Malambo and Barranquilla (Section 2) with 36.7 kilometers, crossing the departments of Bolívar and Atlántico.
The project includes financing, preparation of studies and final designs, environmental management, land management, social management, construction, rehabilitation, improvement, operation and maintenance of the corridor.

SISGEO LATINOAMÉRICA provided services to RUTA COSTERA in the supply and implementation of the structural health instrumentation system for the Crespo Tunnel, including Technical assistance for the installations and commissioning of the monitoring equipment, comprising:

  • 200 kPa titanium piezometers with stainless steel filter and acid-resistant pH1 cable; – 200 kPa titanium piezometers with stainless steel filter and acid-resistant pH1 cable
  • 25 mm vibrating wire rope crack testers with PVC cable; 150 m range laser distance meters;
  • wireless nodes for reading automation;
  • gateways for data transmission.

Integration of the sensors to the web monitoring system – WMS (FIELD)

Related
products

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English