B.R.A.IN MEMS inclinometer systems

Reference products codes: S200D, BRAIN B.R.A.IN (Borehole Readout Array for INclinometers) system is mainly composed by the BRAIN APP compatible with Android and iOS mobile operative systems (device not supplied by SISGEO), digital inclinometer probe (vertical and/or horizontal), and bluetooth reel with control cable. The electronic readout is integrated in the reel and the BLE […]

Xayaburi Hydroelectric Power Project – Laos

The Xayaburi Dam is a hydroelectric dam under construction on the Lower Mekong River approximately 30 kilometres east of Xayaburi (Sainyabuli) town in northern Laos.  The main purpose of the dam is to produce hydroelectric power.With a planned capacity of 1,295 MW – of which 1,220 MW will be sold to the Electricity Generating Authority […]

Ulu Jelai Hydroelectric Project, Malaysia

The Project will involve the construction of an accumulation reservoir (Susu Reservoir) with two main water intakes, Telom Intake and Lemoi Intake, located upstream of Susu reservoir. The main part of the project is the construction of the Susu dam on the Bertram River, more than 80 m high and entirely built using the advanced […]

Inclinometer Casing

Reference products codes: S131 Inclinometer casing is a special grooved tube, generally installed into a drillhole, used in conjunction with inclinometer system to determine sub-surface ground or horizontal soil movements. Automatic surveying is possible with MEMS in-place inclinometers, BH profile IPIs and horizontal IPIs. The inclinometer casing performs the following main functions: it reflects deformations of soil or rock into which it […]

Easy lock ABS inclinometer casings

Reference products codes: S143 The easy-lock inclinometer casing is a grooved tube machined at one end in order to have a self-aligning junction and a pre-assembled coupling at the other end. The special design of the coupling with an internal O-ring provide waterproof joint and nearly flush surface between tube and coupling.The locking system is […]

Quick Joint Inclinometer Casing

Reference products codes: S151 Sisgeo QJ inclinometer tube is an alternative to the traditional inclinometer casings, mainly designed for earth-fill dam and deep boreholes applications. QJ tube offers consistent joint and deeper tube grooves. O-rings prevent ingress of grout or water. The fitted-at-factory casings and the alignment keys assure a perfect grooves continuity. QJ fast installation reduce costs and limit drilling rig […]

Rome Underground – Line C – Italy

Rome metro Line C runs through the city from North-West (Della Vittoria district) to the eastern suburb and is extending beyond the Grande Raccordo Anulare.Line C has a full-run of 25,6 km and 30 stations, passing through the old town centre.The Route will be characterised by the green colour. The interchanges with the other metro […]

Mae Saluam Dam Project, Chang Mai – Thailand

Mae Saluam Dam Project, located at Moo 11, Ban Sahakorn Plang 5, Pa Tum Sub-district, Phrao District, Chiang Mai Province, was proposed by the Regional Irrigation Office 1, the Royal Irrigation Department to store water for agriculture, consumption, and transmission to Mae Saluam Weir for solving drought problems. Courtesy of Sisgeo Asia Pacific Co., Ltd. […]

Lakhta Center, Saint Petersburg – Russia

From the official Lakhta Center web site: Lakhta Center is a large scale project of the construction of a modern business center in Primorsky district of Saint Petersburg exercising a wide range of public functions with a developed public and transport infrastructure. Lakhta Center is implemented as a pilot project of an integrated development of […]