HOME / PROJECTS /

Wala Dam, Jordan

Wala Dam, Jordan

Project Name: Wala Dam Purpose of the project: Irrigation and Water Supply Project location: Madaba Region Hashemite: Kingdom of Jordan Client: Jordan Valley Authority (JVA) Contractor:Aegek-Hydrogradnja J.V. Dam Type:RCC with earthfill abutments (clay core) Height above foundation: 42 m Crest level: 524 m a.s.l. Crest length: 265 m Capacity of the Reservoir: 9.2 million cubic meter Foundation soil: Bitominous Lime Stone End of construction: January […]

Ravedis Dam, Italy

Project Name: Ravedis Dam Purpose of the project: Flood control, irrigation and power Project location: Friuli Region, Italy Client: Consorzio di Bonifica Cellina-Meduna Contractor: CORAV sponsor Impregilo S.p.a. Engineer: IN.CO. S.p.a. Dam Type: Concrete Gravity Height above foundation: 51 m Crest level (above sea level): 343 m Crest length: 173 m Capacity of the Reservoir: 25 million cubic meter Foundation soil: Rock End of construction: November 2004

Komayestan Dam, I.R. of Iran

Project Name: Komayestan Dam Purpose of the project: Irrigation Project location: IRAN – Khorasan- Sabzevar Client: Khorasan Regional Water Authority Contractor: Kahar –e- Khorasan CO. Dam Type:  Concrete gravity dam Height above foundation: 34.5 m Crest length: 835 m Capacity of the Reservoir: 1,200,000 m3 End of construction: February 2002

Karahnjukar Hydroelectric Project, Iceland

The Kárahnjúkar dam is a concrete-faced rock fill dam (CFRD) type with a maximum height of 193m and, when completed it will be the highest of its kind in Europe and among the highest in the world. When full the level of the 57km2 the Hálslón storage reservoir will reach the height of 625m above […]

Sisgeo Piezometers: Comprehensive Solutions for Groundwater Monitoring

What You’ll Learn:

  • Detailed overview of Sisgeo’s range of piezometer technologies including vibrating wire and electric piezometers, outlining their operating principles, installation methods, and suitability for diverse site conditions.
  • Selection of piezometer filters, emphasizing materials and designs that conform to ISO 18674-4 standards.
  • Integration of piezometer data with automated acquisition systems.
  • Best practices for calibration and maintenance standards.

When:Thu, Jul 31, 2025 3:00 PM – 4:00 PM CEST
Language: English

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English