Autopista al Mar 2 project
Autopista al Mar 2 project

Client

Country

Location

Start

End

The Autopista al Mar 2 project is composed by six functional units, covering a total length of 254 kilometers between the municipalities of Cañasgordas and Necoclí, in Antioquia.

The works include the construction of 17.7 kilometres of single carriageway, 63 bridges and 14 tunnels, including the Fuemia tunnel and two false tunnels.

SISGEO LATINOAMÉRICA provides its services to CHEC for the supply and installation of 500 KN load cells in portals 2, 4 and 8 of the tunnels that serve the Autopista Mar 2, part of the Autopistas de Urabá Concession. Dabeiba – Antioquia.

In addition, inclinometer casings and a Brain system have been supplied to control horizontal movements on cutting slopes and portals.

Related
products

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English