SISGEO uses cookies helping us to improve the user experience. By continuing to browse the site, please check our Privacy and Cookies Policy here and click on the “Accept” button. Your continued use of this site indicates your accept to the use of these cookies.

Click on the map to filter by region

Bridge Monitoring on Dnieper River, Kiev, Ukraine

EUROPROMSERVICE LTD

| Country: Ucraina | Location: Kiev | Start: 2008
  • Railway – highway stream crossing with double track railway line and six traffic lanes (three lanes in one direction) across Dnieper River in Kiev City.

    Total length of the bridge is 1.100 meters. End-of-work scheduled term: end of 2009.

    Estimated traffic load is more than 300.000 vehicles per day.

    Load cells are used for monitoring load on to the bridge footings during the construction to prevent unbalanced load which can cause disastrous effects. Load cells will be used during bridge maintenance for exclusion of excessive overloads.

  • RELATED DOCUMENTS

    APPLIED INSTRUMENTS