The Ralco power plant, managed by Enel Generación Chile S.A., is a key energy source in the Biobío Region, utilizing the Biobío River’s power through an artificial dam with a capacity of 689 MW.
Teaming up with Geosinergia LTD (our local partner), we’ve implemented several upgrades:
- Replacing mechanical RST joint gauges with VW Sisgeo joint meters and installing stainless-steel supports for managing filtration water jets;
- Installing filtration level gauges with adjustable stainless-steel supports;
- Incorporating a large-capacity reservoir level gauge;
- Implementing a weather station for comprehensive environmental monitoring;
- Designing and implementing a Warehouse Management System (WMS);
- Automating operations with wireless loggers connected to joint meters, piezometers, water level meters, and reservoir gauges;
- Conducting general civil works and constructing a new facility.
These endeavors are geared toward enhancing the dam’s efficiency, safety, and overall performance, showcasing our dedication to innovative engineering solutions.
Products involved:
- Sisgeo Crackmetes;
- Sisgeo WRLog;
- AIDA IoT;
- Filtration meters;
- Flood level meter;
- Meteorological station.