FAQ#001 – If the SUS optical sensor unit is removed for maintenance, is it possible to continue the monitoring using the pendulum optical manual readout?
It is possible to use the pendulum optical manual readout instead of TEL-310S “SUS” optical sensor unit without any regulation of the “ANS” support. It is also possible to start the pendulum’s monitoring with the pendulum optical manual readout and then automate the readings with TEL-310S telecoordinometer , without changing its initial zero.
Ravedis Dam, Italy
Project Name: Ravedis Dam Purpose of the project: Flood control, irrigation and power Project location: Friuli Region, Italy Client: Consorzio di Bonifica Cellina-Meduna Contractor: CORAV sponsor Impregilo S.p.a. Engineer: IN.CO. S.p.a. Dam Type: Concrete Gravity Height above foundation: 51 m Crest level (above sea level): 343 m Crest length: 173 m Capacity of the Reservoir: 25 million cubic meter Foundation soil: Rock End of construction: November 2004
Komayestan Dam, I.R. of Iran
Project Name: Komayestan Dam Purpose of the project: Irrigation Project location: IRAN – Khorasan- Sabzevar Client: Khorasan Regional Water Authority Contractor: Kahar –e- Khorasan CO. Dam Type: Concrete gravity dam Height above foundation: 34.5 m Crest length: 835 m Capacity of the Reservoir: 1,200,000 m3 End of construction: February 2002