FAQ#015 – The anchor load value displayed on the load cell manometer or readout does not agree with load calculated by the hydraulic jack. What’s right?
The main factors which influence the anchor measurements are: – axial misalignment of the jack– difference in diameter between the jack and the load cell. These factors cause bending of the bearing plate between the load cell and the jack and affects the response of the cell. To minimise this effect use the genuine distribution […]
Athens Metro, Greece

A new, modern, fast, comfortable, reliable and safe transport mode has been gradually been in operation since January 2000. Today, 23 Metro Stations are in operation at both METRO lines: Line 2 SEPOLIA – AGHIOS DIMITRIOS/ALEXANDROS PANAGOULIS (red Line) and Line 3. The whole Project is divided into: The Stations of the Base Project: MONASTIRAKI-ETHNIKI […]
Cantanghel idraulic tunnel, access tunnel and main tunnels – Italy

Project Name: Martignano Tunnel Purpose of the project: Variant of S.S.47 “Valsugana” Project location: Italy – Trento Client: TOTO Costruzioni Spa – Italy Contractor: Provincia di Trento – Italy Tunnel Type: Double highway tunnel Excavation method: TBM machine Total length: About 4.200 meter Tunnel diameter: 12 meter End of construction: December 2006
Chuquicamata Mine (Codelco), Chile

A Landmark Project in Geotechnical Monitoring: 20 Years of Experience, Safety and Innovation Chuquicamata is one of the world’s largest open-pit copper mines, operated by Codelco and located in the Atacama Desert in northern Chile. For over 20 years, Sisgeo has supported this prestigious and iconic project in the field of geotechnical monitoring, supplying hundreds […]