HOME / PROJECTS /

“La Linea” Road Pass, Colombia
“La Linea” Road Pass, Colombia

Client

Country

Location

Start

End

Tunnel “La Linea”, recently inaugurated, connects Colombia from the south-west to the center of the country, from Portal Bermellón in Cajamarca – Tolima, to Portal Galicia in Calarcá – Quindío. With a length of more than 8 kilometers, it is the longest road tunnel in the Americas.
The road has two motorways exits and 13,4 km of dual carriageway, crossing the central mountain range.
To ensure the safety of this ambitious project, Sisgeo Latinoamerica has provided hundreds of instruments for geotechnical and structural monitoring.

Instruments installed:

  • 60 Radial and tangential pressure cells;
  • 30 Vibrating wire strain gauges;
  • 15 Extensometers MPBX 3 bases;
  • 20 Vibrating wire piezometers;
  • 30 Optical targets;
  • 50 Mechanical crackmeters;
  • Switch boxes cable;
  • CRD – 400.

More info about the project: https://youtu.be/-rDR4NlvnDk

Related
products

Sisgeo Piezometers: Comprehensive Solutions for Groundwater Monitoring

What You’ll Learn:

  • Detailed overview of Sisgeo’s range of piezometer technologies including vibrating wire and electric piezometers, outlining their operating principles, installation methods, and suitability for diverse site conditions.
  • Selection of piezometer filters, emphasizing materials and designs that conform to ISO 18674-4 standards.
  • Integration of piezometer data with automated acquisition systems.
  • Best practices for calibration and maintenance standards.

When:Thu, Jul 31, 2025 3:00 PM – 4:00 PM CEST
Language: English

Sisgeo presents the new MD-Profile IPI with 360° calibration
Discover the next generation of In-Place Inclinometers for geotechnical monitoring!

The new MD-Profile 360° features:

  • new removable pressors available for 3 different tube ID
  • new triaxial calibration over the entire 360° range
  • even stronger connectors

When: 27/05/2025 3:00 PM – 3:30 PM GMT+1
Language
: English