HOME / PROJECTS /

Rogun Dam Hydropower Project 

Rogun Dam Hydropower Project 

The Rogun Dam project in Tajikistan is an ambitious hydropower endeavor aimed at harnessing the Vakhsh River to generate renewable energy for the region. Originally launched in 1976 during the Soviet era, the project faced numerous delays due to financial and political challenges, especially after the dissolution of the Soviet Union. Construction was officially revived […]

Urban regeneration: Former Municipal Theatre of Florence

The project to convert the former Municipal Theatre in Florence between Via Solferino, Via Magenta and Corso Italia involves its almost complete demolition and the construction of 160 flats, shops, a gymnasium and an underground car park. This is the most important urban regeneration project in the centre of Florence, which should redevelop an entire […]

Ituango Hydroelectric project

The 2.400MW Ituango hydroelectric project will be the largest hydropower plant in Colombia. The plant is being built on the banks of Cauca River. The project is located in the northwestern region of Antioquia, about 170km north of the Colombian city of Medellin. The project is a part of the initiative undertaken to exploit the […]

Autopista al Mar 2 project

The Autopista al Mar 2 project is composed by six functional units, covering a total length of 254 kilometers between the municipalities of Cañasgordas and Necoclí, in Antioquia. The works include the construction of 17.7 kilometres of single carriageway, 63 bridges and 14 tunnels, including the Fuemia tunnel and two false tunnels. SISGEO LATINOAMÉRICA provides […]

St. Moritz, Chesa Corviglia

St. Moritz Brattas-Fallun, Chesa Corviglia, 22 years landslide and structural health monitoring.Located above the northern part of the town of St. Moritz in Switzerland, there is a 600m wide and about 1500m long clastic flow type landslide. At the sides bounded by parallel shear zones and at the lower end constrained, the Brattas-Fullun landslide is […]

Warsaw Metro Project – Line 2

The 6.5 km east-west route links Rondo Daszyńskiego and Dworzec Wileński includes seven stations and an 870 m tunnel under the Wisła River. The civil works began late in 2010 and became operative in March 2015. In 2016 the works for the extension toward east and west of the second line started, estimated schedule of […]

Electro-hydraulic Load Cells for Steel Linings and Struts

Reference products codes: L2CE Electro-hydraulic load cells consist of stainless steel pad with a pressure transducer.  The piston pad is realised by two plates welded together around their periphery and spaced apart by a narrow cavity saturated under high vacuum with de-aired oil to assure maximum rigidity; so that load is transmitted into a pressure […]

Hydraulic Anchor Load Cells

Reference products codes: L2M0, L2E0 Hydraulic anchor load cells are used to monitor loads in tiebacks, rock bolts and retaining walls. They consist of two ring-shaped stainless steel plates welded together around their circumference. The anular space between the plates is filled under vacuum by deaired oil. The load is directly measured by a Bourdon […]

Electric Anchor Load Cells

Reference products codes: L200, ELC420 Electrical resistance anchor load cell consists of a ring-shaped stainless steel body which incorporates from 8 to 16 electrical resistance strain gauges in full bridge configuration. Typical applications include performance testing of anchor systems in tunneling or deep excavations. The cell design minimizes the sensitivity to the eccentric load. Anchor […]

Bözberg Railway Tunnel anchor load monitoring retaining wall

The new Bözberg railway tunnel will serve as a 4-meter corridor that will be added to the Gotthard route in order to promote transalpine freight transport from road to rail. The largest sub-project within this plan is the replacement of the existing Bözberg tunnel in Switzerland with a new twin-track tunnel. Sisgeo has supplied since […]

Rome Underground – Line C – Italy

Rome metro Line C runs through the city from North-West (Della Vittoria district) to the eastern suburb and is extending beyond the Grande Raccordo Anulare.Line C has a full-run of 25,6 km and 30 stations, passing through the old town centre.The Route will be characterised by the green colour. The interchanges with the other metro […]