HOME / PROJECTS /

Rogun Dam Hydropower Project 

Rogun Dam Hydropower Project 

The Rogun Dam project in Tajikistan is an ambitious hydropower endeavor aimed at harnessing the Vakhsh River to generate renewable energy for the region. Originally launched in 1976 during the Soviet era, the project faced numerous delays due to financial and political challenges, especially after the dissolution of the Soviet Union. Construction was officially revived […]

Andijan Dam Rehabilitation Project

The Andijan Dam, located on the Karadarya River in the Andijan region of Uzbekistan, is a significant hydroelectric facility. Constructed between 1964 and 1974, the dam plays a crucial role in both irrigation and power generation. The dam stands at 115 meters high and stretches 1,900 meters in length, creating the Andijan Reservoir with a […]

Hisorak dam

Hisorak dam, built on the Aksu River, is located in the Kashkadarya Region of the Republic of Uzbekistan. The reservoir is designed to provide water storage for the irrigation of Kashkadarya region. The reservoir has a rock dam with a maximum height of 140 m and a crest length of 528 m. Sisgeo, during the […]

Nichupté Bridge – Cancun

The project involves the construction of an 8.80 km vehicular bridge spanning the Nichupté Lagoon System. Its primary goal is to establish a new road link starting from the Monumento Antigua Torre de Control traffic circle, specifically at the Kabah road distributor where Bonampak, Kabah, and Tulum Avenues converge. This connection will ultimately link with […]

Metro De Bogotá – Línea 1

Supply and install geotechnical instrumentation for the Patio Taller, and monitor the construction of the embankment, to keep track of the displacements in the terrain, the proposed works and the existing infrastructure, and the variable pore pressure. It includes the manual and automatic monitoring of the instruments installed for the entire time of construction of […]

FAQ#120 – Why can’t I connect the MIND readout to my mobile phone/tablet?

Make sure that ALL the following steps are checked:1. The batteries of the mobile phone/tablet and the MIND readout are charged2. You have installed the latest version of the MIND APP (check the Google Play Store)3. The version of the mobile phone/tablet’s operating system is Android 10 or higher4. The Bluetooth version of the mobile […]

FAQ#113 – Why I’m not able to connect my mobile/tablet to MIND readout?

Verify that the mobile phone/tablet used does have the minimum required features:Bluetooth Low Energy BLE 4.2APPLE iOS 14 or higherAndroid OS 9 (suggested Android OS 10 or higher) Then please check that the mobile phone/tablet has Bluetooth on and that the MIND unit has a sufficiently charged battery.

MIND Readout

MIND Readout Reference products codes: MINDThe MIND is the new portable multichannel readout unit able to read and store data from both digital and analogue instruments. It is compact, rugged, with IP65 protection class and it is supplied with a specially designed carrying bag.The BLE (Bluetooth Low Energy) wireless technology permits a fast and safe […]