HOME / PROJECTS /

Rogun Dam Hydropower Project 

Rogun Dam Hydropower Project 

The Rogun Dam project in Tajikistan is an ambitious hydropower endeavor aimed at harnessing the Vakhsh River to generate renewable energy for the region. Originally launched in 1976 during the Soviet era, the project faced numerous delays due to financial and political challenges, especially after the dissolution of the Soviet Union. Construction was officially revived […]

Andijan Dam Rehabilitation Project

SHM in dam rehabilitation had a great involvement in the rehabilitation project of the Andijan Dam, located on the Karadarya River in the Andijan region of Uzbekistan, a significant hydroelectric facility.

The Andijan Dam, located on the Karadarya River in the Andijan region of Uzbekistan, is a significant hydroelectric facility. Constructed between 1964 and 1974, the dam plays a crucial role in both irrigation and power generation. The dam stands at 115 meters high and stretches 1,900 meters in length, creating the Andijan Reservoir with a […]

5 New Large Dams in Morocco

In 1967, H.M. Hassan II king of Morocco launched his program to bring better water managing facilities to his country. More than 100 dams had arisen across the country before the 21st century, mainly with the objective to enhance the agriculture sector. In reaction to the global warming and intense droughts suffered by the country, […]

Ralco Dam Rehabilitation Project

The Ralco power plant, managed by Enel Generación Chile S.A., is a key energy source in the Biobío Region, utilizing the Biobío River’s power through an artificial dam with a capacity of 689 MW. Teaming up with Geosinergia LTD (our local partner), we’ve implemented several upgrades: These endeavors are geared toward enhancing the dam’s efficiency, […]

Mercatale Dam Rehabilitation Project

Field srl has successfully implemented data management and maintenance for the automatic topographic monitoring system at Mercatale Dam, overseen by the Public Authority Consorzio di Bonifica Marche. This sophisticated system comprises a total robotic station and a topographic network of macroprisms and clinometers connected to a data logger, facilitating real-time monitoring. Operating in fully automatic […]

El Quimbo Dam Rehabilitation Project

The El Quimbo Dam, located in Huila Department, Colombia, is a concrete-faced rock-fill hydroelectric facility positioned 1,300 meters upstream from the confluence of the Páez River with the Magdalena River. The accompanying powerhouse in Huila District has a 400-megawatt capacity, generating an estimated 2,216 gigawatt-hours annually. Installed Systems:

Afşar Dam

Afşar Dam is a rock fill dam with a front surface concrete coated, it has a height of 138 meters and a body filling volume of 6 million m3.The dam is located on the Ilıcapınar Stream in Konya’s Taşkent district, in Turkey. Afşar Dam has started to hold water, the waters that will be stored […]

Ouldjet Mellegue Dam

The Ouldjet Mellègue dam is a Roller-Compacted Concrete Gravity Dam, located in northeastern Algeria about 13 km upstream of the city of Ouenza, in the Tébessa region. The site of the Ouldjet Mellègue dam is located at the outlet (Ouldjet) of the river Oued Mellègue, across the Jebel Krorza, in the north-east of Algeria, some […]

Limfjordstunnelen – Tunnel monitoring

Limfjordstunnelen is a Danish motorway tunnel which connects the highway in eastern Aalborg with the highway east of Nørresundby. Opened 6 May 1969, it was the country’s first motorway tunnel. The tunnel measures 582 metres (1,909 ft) in length, and 27.4 metres (90 ft) in width. Limfjordstunnelen comprises a 6-lane motorway, which is part of the E45. The tunnel consists of […]

Neckartal Dam project

In March 2020 the huge dam of Neckartal was inaugurated in Namibia. This dam is fundamental to bring water to the Namibian desert and irrigate 5 thousand hectares of land, stimulating the agriculture and creating employment.This work, realized with the RCC technology (Roller-Compacted Concrete), is the biggest dam of Namibia: 80m high, 518 long and […]

Fuel terminal monitoring

Supply of instrumentation for the monitoring of fuel terminal tanks in the city of Cuenca, Ecuador. The scope includes the monitoring of the settlements of structures through H-Level settlement cells and tiltmeters. The settlements and horizontal movements of the ground will be evaluated through IPI inclinometer probes and DEX S probes.

“La Linea” Road Pass, Colombia

Tunnel “La Linea”, recently inaugurated, connects Colombia from the south-west to the center of the country, from Portal Bermellón in Cajamarca – Tolima, to Portal Galicia in Calarcá – Quindío. With a length of more than 8 kilometers, it is the longest road tunnel in the Americas. The road has two motorways exits and 13,4 […]